BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Millet, Alberta. Contact the soliciting agency for additional information.

The purpose of the Millet Flood Study is to assess and identify flood hazards along Pipestone Creek, Eyot Creek, and Snake Drain through the Town of Millet and the County of Wetaskiwin. The study will be completed under the provincial Flood Hazard Identification Program (FHIP), the goals of which include enhancement of public safety and reduction of future flood damages through the identification of flood hazards. Hydraulic modelling and flood mapping is required for approximately 15 km of Pipestone Creek, 4 km of Eyot Creek, and 2 km of Snake Drain. The study reach for Pipestone Creek extends from Range Road 250 downstream to the eastern boundary of NW 15-47-24-W4M, the study reach for Eyot Creek extends from the north edge of NE 6-48-24-W4M downstream to the confluence with Pipestone Creek, and the study reach for Snake Drain extends from the western edge of SE 31-47-24-W4M downstream to the confluence with Eyot Creek. The estimated contract period will be 13 month(s), with a proposed start date of 2024/02/26. The method of Contractor Selection has not been Determined at this time

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
16
Bidding Soon
269
All Active Projects
97
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2024

img_map_placeholder

Multiple Locations, Millet, AB

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.