BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a fire / police facility in San Diego, California. Completed plans call for the renovation of a fire / police facility.

A. The Work Includes 1. Furnish All Labor, Materials, Equipment, Supplies, Transportation and Disposal as Necessary to Complete the Construction of Division 1 - General Requirements, San Diego, California. 2. The Work Shall Include but is Not Limited to the Following: A. Removal and Disposal of Approximately 12,000 Square Feet (Harbor Police Administration Building) of Built Up Roof System Down to Wood Substrate Including All Materials Attached to the Existing Roofing System as Shown on the Drawings. Installation of New Fully Adhered Thermoplastic Polyolefin (Tpo) Membrane Roofing System Over High Density Coverboard Polyisocyanurate Insulation on the Existing Roof Wood Plank Decking. B. Removal and Disposal of All Cants, Flashing, Copings, Roof Drains and All Roof Penetrations. Installation of New Flashing, Flashing, Coping, Roof Drains and All Roof Penetration. C. Proper Removal and Disposal of Asbestos Containing Materials and Lead Paint Containing Surfaces Listed on Appendix C - Limited Hazardous Building Materials Survey of Harbor Police Administration Building of the Specifications. D. Removal and Disposal of Mechanical Equipment, All Related Ductwork and Appurtenances at the Harbor Police Administration Building and the Two Metal Buildings (Hp Auxiliary Building 1w and Hp Auxiliary Building 2e) as Shown on the Drawings. E. Installation of New Mechanical Equipment, All Related Ductwork, Seismic Restraint and All Other Related Appurtenances as Shown on the Drawings and as Specified. F. Demolition and Modification of Electrical System Related to the Installation of New Ac System Including Installation of Uninterruptible Power System (Ups) Including Connection to the Existing Temporary Power. G. Installation of New Automatic Control System for the New Hvac Equipment at the Harbor Police Administration Building. All Existing Hvac System in the Gymnasium, Annex Building, Investigation and Patrol Building Shall Be Connected to the New Automatic Control System. H. Testing, Balancing, Commissioning and Training of District Staff of New Hvac Equipment and Automatic Control System. I. Protection of All Existing Improvements That Are Not Included for Demolition, Otherwise Noted on the Drawings. J. Installation of Mobile Temporary in Certain Rooms at the Harbor Police Administration Building as Necessary During Construction. K. Use of Crane and Permit Requirements and Other Means and Methods for Completion of the Work. L. Other Works as Shown on the Drawings and as Specified. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,500.00 Calendar Days Estimated Bid Value $1,600,000.00 Start/Delivery Date May 2024 Project Duration 90 Calendar Days Questions or comments regarding this specification must be submitted electronically to our eBid system where the specification was downloaded and must be received by the Port no later than February 8, 2024, at 1:00 p.m. the Port reserves the right to reject any or all bids, or to waive any informality in a bid. Removal and disposal of approximately 12,000 square feet (Harbor Police Administration Building) of built-up roof system down to wood substrate including all materials attached to the existing roofing system as shown on the drawings. Installation of new fully adhered Thermoplastic Polyolefin (TPO) Membrane Roofing System over high density coverboard polyisocyanurate insulation and 3/8" thick plywood sheathing on the existing roof wood plank decking and other work as shown on the drawings.

Award

Fire / Police

$1,509,053.00

Public - County

Renovation

40

28

10

8

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

May 6, 2024

img_map_placeholder

3380 N Harbor Dr, San Diego, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.