Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 28, 2025 at 8:00 PM
Updated July 29, 2025
Site work for a civil project in Tomball, Texas. Working plans call for site work for a water / sewer project.
Update:https://tomballtx.gov/DocumentCenter/View/7816/City-of-Tomball-FY2025-Adopted-Budget-Book-PDF Design and construction of a 16-inch water line to be constructed along W. Hufsmith from the drainage channel to N. Cherry/Ulrich Road. The recommended line is sized to serve through 2024 peak hourly demand and provide distribution system capacity for maintaining elevated storage tank water level and increasing available fire flow. This project was identified in the Water Master Plan in the highest priority tier of needing to be constructed. Project is included City of Tomball Fiscal Year 2025-2029 Page No 295 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Design and construction of a 16-inch water line to be constructed along W. Hufsmith from the drainage channel to N. Cherry/Ulrich Road. The recommended line is sized to serve through 2024 peak hourly demand and provide distribution system capacity for maintaining elevated storage tank water level and increasing available fire flow. This project was identified in the Water Master Plan in the highest priority tier of needing to be constructed. This project is part of the city's 2024-2028 Capital Improvement Program. As of July 28, 2025, this project is out to bid. Construction is expected to start October 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Water / Sewer
$2,210,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 13, 2025
W Hufsmith Rd, Tomball, TX
Related To This Project
Tomball, TX
--
Tomball, TX
--
Tomball, TX
Bid Date: Mar 06 2024
Tomball, TX
--
Tomball, TX
Bid Date: Jun 07 2024
Tomball, TX
Bid Date: Feb 08 2024
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
