Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to a mixed-use development in Sacramento, California. Completed plans call for the addition of a 40,000-square-foot power facility; for the demolition of a power facility; for the renovation of a 9,000-square-foot power facility; and for site work for a power facility.
The Central Utility Plan (CUP) Expansion addresses the utility requirements for the new buildings at UC Davis Health’s Sacramento campus. The upgrade and expansion are currently a baseline program of a +40,000 (gsf) new annex building and 9,000 (gsf) of renovations within the existing CUP, Department of Health Care Access and Information (HCAI) Level-1 utility space, diesel generators, electrical rooms and administrative support space to facilitate campus operations. This project will support the California Tower and other projects with site and building utility infrastructure upgrades. Scopes will be both HCAI and Non-HCAI. Work in this bid package includes Mechanical and Plumbing Systems for the Central Utility Plan Expansion Plant including Preconstruction, Design-Build, and Construction Services. THE OVERALL TARGET COST OF THIS PROJECT IS $193,000,000 THE TARGET COST FOR THIS BID PACKAGE IS $36,700,000
Post-Bid
Power Plant
$36,700,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 9, 2024
February 26, 2024
4840 2nd Ave, Sacramento, CA
Related To This Project
Sacramento, CA
Bid Date: Feb 15 2024
Sacramento, CA
Bid Date: Jan 25 2024
Sacramento, CA
--
Sacramento, CA
--
Sacramento, CA
--
Sacramento, CA
Bid Date: Feb 14 2024
Sacramento, CA
--
Sacramento, CA
Bid Date: Feb 09 2023
Sacramento, CA
Bid Date: Feb 09 2024
Sacramento, CA
--
Sacramento, CA
Bid Date: Apr 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.