BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Renovation of a water / sewer project in Ontario, California. Completed plans call for the renovation of a water / sewer project.

License Requirements Class A Start/Delivery Date Project Completion October 2027 Liquidated Damages Yes Online Q&A Yes Q&A Deadline 03/25/2025 4:00 PM (PST) IEUA is seeking to prequalify construction contractors that are qualified to construct the RP-1 Air Compressor Upgrades, The primary goal of this project is to replace the existing nine independent air compressor systems with 2 new centralized air compression systems to replace obsolete equipment, create a more balanced system, streamline operations and maintenance, reduce the risk of failures, and extend the longevity of the compressed air system for the plant and instrument air needs at RP- 1. The major project scope items are summarized below: 1. Provide two separate centralized air compression systems at RP-1 for the following systems: the Primary, Secondary, and Solids Process Areas (System 1) and the Tertiary Process Area (System 2). 2. Replace twenty-one existing air compressors with six new standardized air compressors (four new compressors for System 1 and two new compressors for System 2, including new air receivers and air dryers. 3. Provide new looped underground and overhead rack piping with pipe supporting systems. Buried piping will be located in heavily congested areas and safety precautions including potholing techniques will be required to avoid hitting and breaking existing utility lines. 4. Provide new pressure transmitters and automated system controls as well as redundant power feeds for each compressor system for reliability. 5. Replace the three existing headworks channel and primary influent channel aeration blowers with new multistage centrifugal blowers equipped with variable frequency drives (VFDs). 6. Provide operation and maintenance on-site training by an authorized representative of the equipment manufacturer for all major and control system equipment for three discipline groups as follows: Maintenance Staff (electricians, instrument technicians, mechanics), Operations Staff, and Operational Technology/Information Technology Staff (control systems analysts/network administrators).

Post-Bid

Water / Sewer

$4,900,000.00

Public - City

Renovation

118

31

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
604
Active Projects
258
Bidding Soon
3,392
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.