BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Site work for a water / sewer project in Macon, Missouri. Conceptual plans call for site work for a water / sewer project.

As of October 30, 2025, per owner, in preliminary stage. No design engineer nor contractor has been selected. Still putting the pieces together to obtain funding and identify the path(s) forward. Macon Municipal Utilities is requesting qualifications for engineering services to address necessary improvements of both its drinking water and wastewater treatment facilities. The engineering services required may include associated planning (to include necessary studies), stakeholder communications, construction oversight of the project. Facility plans and engineering reports should adhere to 10 CSR 20-8.110 Engineering -Reports, Plans, and Specifications. All or part of project funding is through the Missouri Department of Natural Resources' Financial Assistance Center. Qualification information provided to the Macon Municipal Utilities shall include: A. The specialized experience and technical competence of the firm with respect to the type of services required (20 points). B. The capacity and capability of the firm to perform the work in question, including specialized services, within the time limitations fixed for the completion of the project (20 points). C. The past record of performance of the firm with respect to such factors as control of costs, quality of work, and ability to meet schedules (10 points). D. The firm's proximity to and familiarity with the area in which the project is located (10 points). E. The firm's professional experience in designing water & wastewater treatment systems (20 points). F. Any projects completed with unique (read creative) solutions to a client's challenges (20 points). Inquiries can be emailed to dulmer@maconutilities.com. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$600,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
26
Bidding Soon
426
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

Project location map

Multiple Locations, Macon, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.