Site work for a water / sewer project in Fargo, North Dakota. Completed plans call for site work for a water / sewer project.

Cost estimate is between $4,000,000 to $8,000,000. The Work is comprised of two (2) Contracts: Contract No. 1 - PVC Pipeline Construction and Contract No. 2 - HDPE Pipeline Construction with only one being awarded. The Work is generally described as follows: Contract No. 1: PVC Pipeline Construction: Construction of rural water supply pipelines consisting of furnishing and installing the following approximate quantities: Open-cut 500 feet of 1.5-inch DR11 IPS poly pipeline, Open-cut 4,300 feet of 8-inch SDR 26 IPS PVC pipeline, Open-cut 1,500 feet of 10-inch DR 13.5 IPS poly pipeline, Open-cut 8,900 feet of 10-inch SDR 26 IPS PVC pipeline, Open-cut 34,000 feet of 12-inch SDR 26 IPS PVC pipeline, 550 feet of 1.5-inch DR 11 IPS poly directional bores, 250 feet of 8-inch DR 13.5 IPS poly directional bores, 500 feet of 10-inch DR 13.5 IPS poly directional bores, 2,750 feet of 12-inch DR 13.5 IPS poly directional bores, four (4) Sheyenne Diversion Crossings with poly carrier pipe within poly casing pipe; thirteen (13) detailed tie-ins, one (1) 3-inch gate valve, thirteen (13) 8-inch gate valves, three (3) 10-inch gate valves, nine (9) 12-inch gate valves, five (5) dual blow off PVC pits, and all associated fittings and appurtenances, restoration, flushing and testing, signage, seeding, and gravel. Contract No. 2: HDPE Pipeline Construction: Construction of rural water supply pipelines consisting of furnishing and installing the following approximate quantities: Open-cut 500 feet of 1.5-inch DR11 IPS poly pipeline, Open-cut 5,800 feet of 10-inch DR 13.5 IPS poly pipeline, Open-cut 8,900 feet of 12-inch DR 13.5 IPS poly pipeline, Open-cut 34,000 feet of 14-inch DR 13.5 IPS poly pipeline, 550 feet of 1.5-inch DR 11 IPS poly directional bores, 250 feet of 10-inch DR 13.5 IPS poly directional bores, 500 feet of 12-inch DR 13.5 IPS poly directional bores, 2,750 feet of 14-inch DR 13.5 IPS poly directional bores, four (4) Sheyenne Diversion Crossings with poly carrier pipe within poly casing pipe; thirteen (13) detailed tie-ins, one (1) 3-inch gate valve, twelve (12) 8-inch gate valves, three (3) 10-inch gate valves, one (1) 12-inch gate valve, nine (9) 14-inch gate valves, five (5) dual blow off PVC pits, and all associated fittings and appurtenances, restoration, flushing and testing, signage, seeding, and gravel. Bidders are required to comply with Davis-Bacon prevailing wage requirements. Any lead service line replacements conducted under this project must replace the entire lead service line, not just a portion, unless a portion has already been replaced or is concurrently being replaced with another funding source. Bidders on this work will be required to comply with Title 40 CFR Part 33- Participation by Disadvantaged Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. To demonstrate a good faith effort to comply, bidders must include the MBE/WBE subcontractor solicitation form in the bid package. The work for Contract No. 1 and Contract No. 2 must be completed no later than the following: 1. Substantial Completion - June 15, 2025 2. Final Completion - July 15, 2025 All Bids will be made on the basis of cash payment for such work. After Bid opening, the Owner will return Bid security of all except the three lowest responsible Bidders. When the Contract is awarded, the remaining unsuccessful Bidder's Bonds will be returned. The Owner reserves the right to reject any or all Bids, and further reserves the right to award the Contract in the best interests of the Owner. The Owner reserves the right to hold the three (3) low Bids for a period of sixty (60) days after the date of the Bid opening to complete financial arrangements.

Post-Bid

Water / Sewer

$8,000,000.00

Public - County

Site Work

28

20

10

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Water, Construction Facilities, Field Offices and Sheds, First Aid Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Stripping and Stockpiling, Soil Stripping and Stockpiling, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Landscape Grading, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Slings

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
11
Bidding Soon
120
All Active Projects
51
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Fargo, ND

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

CRWD - 2024 Reservoir D Supply Pipeline Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.