EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 5, 2024 at 7:00 PM

Updated March 6, 2024

Site work and paving for a road / highway in Crookston, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of March 5, 2024, the project was awarded to Knife River - Bemidji in the amount of 1,762,175.50 State Aid Project No. Sap 060-614-023 Sap 060-645-025 ; COUNTY PROJECT 123- 45 -1340 Location: on Csah 14 From Csah 45 to Th 75, 1.0 Mile South of Crookston, Mn On Csah 45 From Th 220 to Th 75 at Eldred, Mn Type of Work: Milling, Bituminous Overlay and Aggregate Shouldering Major Items: Type Sp 9.5 Wearing Course Mix 23,600 Ton Mill Bituminous Surfacing 55,500 Square Yard Aggregate Base / Surfacing 9,000 Ton Electronic bids must be accompanied by a certified check or corporate surety bond in favor of the Treasurer of Polk County for at least 5% of the total amount bid. Expected Award Date:02/27/2024 Project Start Date:06/01/2023 Construction Start Date:06/01/2023 Construction End Date:10/01/2023 The right is reserved to reject any or all bids and to waive any informalities or technicalities therein. The workforce participation goals for this Project are: MBE- 12 % Women: 9%

Award

Roads / Highways

$1,762,175.00

Public - County

Paving, Site Work

19

5

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Aggregate Surfacing, Paving Specialties, Pavement Markings
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
9
Bidding Soon
211
All Active Projects
52
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

March 25, 2024

img_map_placeholder

Multiple Locations, Crookston, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.