BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 25, 2024 at 8:00 PM

Updated May 26, 2024

Site work and paving for a mixed-use development in Miami, Florida. Working plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; water / sewer project; and water / sewer project.

bids rejected Scope of Work: The Morningside Park Baywalk, Kayak Launch, and Boat Ramp ("Project") is a new construction development project located at 5215 NE 7th Avenue, Miami, Florida 33137. The Work consists of furnishing all materials, labor, and equipment necessary for the installation of turbidity curtains and approximately 1,500 linear feet ("LF") of bulkhead including the steel sheet pile, concrete bulkhead, baywalk with stabilized limestone, pea gravel, concrete shell aggregate finish, and underground drainage, tree planting, relocation of select trees to an upland area within the park (per Tree Disposition Plan), drainage infrastructure including innovative treatment devices, kayak launch, solar lighting, seating benches, picnic tables, trash receptacles, irrigation, bike racks, signage, and other park amenities. The full Scope of Work is detailed in the construction drawings project documents. Question Deadline 02/08/2024 at 5:00 PM ET Written questions must be submitted through Periscope S2G Late questions will not be considered. Minimum Requirements: Prospective Bidders shall meet the following requirements, and submit the required supporting documentation with their bids, by the Bid Due Date: 1) Have a current Certified General Contractor ("CGC") license from the State of Florida AND have a minimum of five (5) years' experience under its current business name. 2) The General Contractor shall demonstrate experience as the Prime Contractor for at least two (2) projects, park-related preferred, to include seawall and/or baywalk components of comparable scope, scale, and complexity to the Project, completed within the last ten (10) years. The General Contractor must have a proven track record of coordination with and between all applicable trades, including but not limited to, structural, mechanical, plumbing, marine and coastal, and electrical components as it may be required during the construction of the Project. 3) Reference of park-related projects to include seawall and/or baywalk components must be submitted utilizing Form ITB-GCR and shall demonstrate that the General Contractor: i) was the General Contractor for the project; and ii) self-performed at least thirty percent (30%) of the physical labor construction work for the project. At a minimum, the Contractor is responsible for the mobilization of labor and equipment, site security, installation of the project perimeter fence, clearing and grubbing, demolition and disposal of existing drainage and park amenities.

Final Planning

Playgrounds / Parks / Athletic Fields

$16,886,344.00

Public - County

Paving, Site Work

170

15

5

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
110
Bidding Soon
1,703
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.