Site work for a water / sewer project in Palm Coast, Florida. Completed plans call for site work for a water / sewer project.

SCOPE OF SERVICES: The Work consists of the construction of over 16,000-ft of new 8- 12 sewer force main plus 4 force main stubouts along A1A from Jungle Hut Rd. to Malacompra Rd. and along Malacompra Rd. from A1A to Malacompra Rd. Beachfront Park. Directional drill construction includes11,450-ft (+/-) of new 12 PE force main and 3,500-ft (+/-) of new 8 PE force main. Open cut construction includes 700-ft (+/-) of new 12 PVC force main, 370-ft (+/-) of new 8 PVC force main, and 75-ft (+/-) of new 4 PVC force main. This project includes work in areas that include coquina shell /rock: It is not a continuous shelf of coquina, but rather fragments of coquina rock which are mixed with in the sand. The Contractor should be prepared to utilize specialized equipment in order to facilitate excavation activities if they encounter larger pieces of coquina along the alignment. This project is being supported, in whole or in part, by federal award number FAIN 596000605, awarded to Flagler County by the U.S. Department of the Treasury. The Contractor shall be an Equal Opportunity Employer, and is to abide by Davis-Bacon prevailing wage requirements. Weekly certified payrolls and statements of compliance from the Contractor and all Subcontractors will be required throughout construction. Documentation of affirmative steps for Minority and Womens Business Enterprise participation will be required from the apparent lowest, responsive , responsible bidder. The City has a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products); the City preference must be identified and included in all sub awards including all contracts and purchase orders for work or products under the Project CONTRACT TIME: Total construction time to achieve Substantial Completion for the Project is fourhundread sixty (460) calendar days consecutive calendar days from the date of the Notice to Proceed, with an additional sixty (60) consecutive calendar days to achieve Final Completion. QUESTIONS: Any questions concerning the intent, meaning and interpretations of the bid documents including the draft agreement, shall be requested in writing through the City Procurement Portal Web Page at least seven (7) calendar days prior to the due date. QUESTION DEADLINE: February 9, 2024, at 2:00 PM the participation goal for construction contracts is 4 percent for black Americans, 6 percent for Hispanic-Americans, and 11 percent for American women.

Award

Water / Sewer

$2,948,363.00

Public - City

Site Work

42

15

8

7

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
63
Bidding Soon
1,145
All Active Projects
474
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2024

September 23, 2024

img_map_placeholder

Multiple Locations, Palm Coast, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.