Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Seattle, Washington. Contact the soliciting agency for additional information.
The Seattle Housing Authority (SHA) is seeking proposals from qualified contractors to maintain right of ways, mowing, edging, fertilize, weed control, noxious weeds, shrub trimming, leaf removal, climbing vines, management of irrigation system, winterize, start up in spring, tree maintenance, trash removal and general clean-up, plant replacement, insect and disease control as needed at Hinoki. location at 110 10th Ave S. Kirkland, WA 98033. This project is estimated to be between $100,00.00 and $110,000.00 Deadline to submit questions: wednesday, january 31, 2024 at 4:00 pm pacific time (pt). Email your questions to: purchasing@seattlehousing.org a. Provide all labor, material, supplies and equipment necessary to maintain the property as noted on the attached diagram and as described in this specification. b. All work shall be done in accordance with industry standards and regionally accepted landscaping practices. c. At the beginning of the Contract, the Contractor shall submit a proposed schedule and manpower projection as required to accomplish the work indicated. d. All work shall be accomplished on a regularly scheduled basis during normal working hours (7:00 a.m. to 7:00 p.m., Monday through Friday, except holidays). e. Contractor shall provide the name of their contact person who can be reached by phone during the hours of 7:30 a.m. through 5:00 p.m., Monday through Friday. This person shall have the authority to give supervisory instruction to the crew assigned to this Contract. f. Contractor performance will be reviewed periodically for compliance with the terms of the Contract. g. Material Safety Data Sheets (MSDS). The contract shall supply the Senior Property Manager with copies of all Materials Safety Data Sheets (MSDS) for all fertilizers, chemicals, fungicides, herbicides, pesticides and insecticides used for landscape maintenance breakage, but when it does occur, Management must be notified the day it happens. At that time Management will determine cause and responsibility. A. Winterizing irrigation system: To be done annually prior to freezing weather (typically, late October to early November). The system will be drained and shut down for the winter and email confirmation of date performed must be sent to the site's property manager within 5 days of shut down. B. Spring start up: Start up the system for irrigation purposes during the dry season weather (typically, April to early May). System repairs will be identified and will be billed outside of the contract on a time and materials basis. System start up and repairs must be completed prior to June 1st and email confirmation of date performed must be sent to the site's property manager within 5 days of startup. Tree Maintenance Trees to be pruned are no higher than 12 feet. Pruning shall be done based on requirements specific to the plant. Trees larger than 12 feet high require the service of a trained and insured arborist and work done shall be with the approval of management. Newly planted trees shall not be pruned until established for 5 years. All trees will be fertilized per attached schedule. All trees will be staked or guyed until the trunk has reached sufficient caliber to support the head of the tree or that the tree root system has sufficiently established itself. The contractor shall comply with all federal, local and state laws and regulations for any tree maintenance activities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Municipal
$110,000.00
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 22, 2024
March 22, 2024
Multiple Locations, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Feb 28 2024
Seattle, WA
Bid Date: Feb 28 2024
Seattle, WA
Bid Date: Feb 05 2024
Seattle, WA
Bid Date: Feb 07 2024
Seattle, WA
Bid Date: Feb 12 2024
Seattle, WA
--
Seattle, WA
Bid Date: Feb 08 2024
Seattle, WA
Bid Date: Feb 27 2024
Seattle, WA
--
Seattle, WA
Bid Date: Jan 31 2024
Seattle, WA
Bid Date: Jan 30 2024
Seattle, WA
--
Seattle, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.