BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a water / sewer project in Huron, California. Completed plans call civil work for a wastewater treatment plant.

Water Distribution System Pipeline Replacement Project - The major work consists of installing 10" water lines, 8" water lines, valves, and 6" fire hydrants. The work includes traffic control, sidewalk demolition, construction of new sidewalks, curb, gutter, drive approaches, and pavement restoration within the City of Huron, County of Fresno, as shown on the plans and in the specifications. Also included, the supplying of all labor, equipment, tools and materials required to make the work complete and operable and also the following: 1. Contact PG & E to inform them of the project schedule. 2. Contact the City of Huron Public Works Department to inform them of the project schedule. 3. Contact the Huron Police Department and Fresno County Fire Protection District and inform them of the proposed schedule. 4. Install signs and barricades to control traffic in the areas of construction, and control dust. 5. Restore areas where the existing street surfacing are destroyed. 6. Cleanup of work area The time for completion is one hundred twenty (120) working days. 1 Mobilization and Demobilization LS 1 2 Traffic Control LS 1 3 Construction Surveying LS 1 4 12" Water Valve EA 1 5 10" C900 Pipe LF 2,456 6 10" Water Valve EA 17 7 10" Miscellaneous Fittings LS 1 8 8" C900 Pipe LF 12,747 9 8" Water Valve EA 89 10 8" Miscellaneous Fittings LS 1 11 6" C900 Pipe LF 8,333 12 6" Water Valve EA 70 13 6" Fire Hydrant Connection LF 847 14 6" Miscellaneous Fittings LS 1 15 4" Blow Off Valve EA 2 16 Hot Taps EA 3 17 1" CTS ASTM D2737 Polyethylene Pipe LF 6,160 18 1" Service Connection EA 371 19 Fire Hydrant with Bury EA 34 20 Trench Surface Restoration SF 73,149 21 California Department of Water Resources Sign EA 1 Question Deadline 02/20/2024 at 5:00 PM PT Requests for clarification or questions shall be delivered to the Engineer AM Consulting Engineers Attn: Angela Hall angela.hall@am-ce.com 5150 N. Sixth St. Suite 124 Fresno, CA 93710

Post-Bid

Water / Sewer

$4,400,000.00

Public - City

New Construction, Site Work

43

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
26
Bidding Soon
409
All Active Projects
172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.