Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 23, 2024 at 8:00 PM
Updated March 24, 2024
Renovation of a power facility in East Fayetteville, North Carolina. Completed plans call for the renovation of a power facility.
Fayetteville Public Works Commission intends to solicit bids from qualified vendors to furnish and deliver all materials and equipment (except materials and equipment specified to be furnished by the Owner) complete and conforming to the Technical Specifications for a Prefabricated Relay Control House for the Cumberland Road 69 to 15 kV Substation and P.O. Hoffer 69 to 15 x 25 kV Substation, all as set forth in the Bid Schedules. Direct all inquiries concerning this IFB to: Victoria McAllister Procurement Manager procurement@faypwc.com Questions regarding this bid must be submitted in writing to the attention of Victoria McAllister, Procurement Manager at procurement@faypwc.com with the subject header "IFB PWC2324035- Questions" no later than 5:00 p.m., Tuesday, January 2, 2024, in order to be considered for a response. These Specifications cover the design, manufacture, delivery, and installation, in good order, for one (1) prefabricated relay control house, as specified herein, and as required for the operation of the Cumberland Road Substation and PO Hoffer Substation. The work shall include furnishing all labor, materials, equipment, and supplies, except materials and equipment to be furnished by others, necessary for the complete fabrication of the prefabricated relay control house including all primary and secondary structural framing members, connecting bolts, covering adjustable louvers, doors, flashing, closures, sealer, insulation, house wiring for outlets,switches, ventilation, and light fixtures, electric distribution panels, and other miscellaneous items as shown or called for in the Drawings or Specifications. The building is to be used for the substation relay control house upon their completion. The building shall be completely wired and fully built when delivered. The relay panels will be drop shipped to the Bidder for installation and wiring to termination cabinet, ac and dc panels. The Bidder will unload the building and place it on the foundation. Any parts removed for shipment shall be reinstalled by the Bidder. The intent of this specification is that the Bidder deliver and install one (1) fully functional control building, minus batteries, to the Cumberland Road Substation and PO Hoffer Substation.
Bid Results
Power Plant
$605,890.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2024
March 4, 2024
570 Hoffer Dr, East Fayetteville, NC
Related To This Project
East Fayetteville, NC
Bid Date: Mar 14 2024
East Fayetteville, NC
Bid Date: Feb 29 2024
East Fayetteville, NC
Bid Date: Mar 06 2024
East Fayetteville, NC
--
East Fayetteville, NC
Bid Date: Feb 29 2024
East Fayetteville, NC
Bid Date: Apr 09 2024
East Fayetteville, NC
--
East Fayetteville, NC
Bid Date: Mar 12 2024
East Fayetteville, NC
Bid Date: Dec 19 2023
East Fayetteville, NC
Bid Date: Oct 08 2019
East Fayetteville, NC
Bid Date: Dec 08 2023
East Fayetteville, NC
Bid Date: Feb 20 2024
East Fayetteville, NC
--
East Fayetteville, NC
Bid Date: Feb 22 2024
East Fayetteville, NC
Bid Date: Feb 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
