BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Nevada, Iowa. Completed plans call for site work for a water / sewer project.

This Main Tile Repair Project consists of three separate construction divisions. Division 1 deals with work on private land that has received funding from IDALS. Division 1 includes construction of approximately 360 linear feet of 36" diameter RCP tile, crushing the old Main Tile, and connections of existing private tile to the repaired facility. Division 2 is construction across Story County Road ROW and consists of constructing approximately 80 linear feet of 36" diameter steel pipe, jack and bored under 170th St, and filling and plugging the existing tile. Division 3 deals with work on private land and consists of constructing approximately 100 linear feet of 36" diameter RCP tile, including crushing the existing tile and connection of private tile to the repaired facility. Time for Commencement and Completion of Work. Work on the Repair shall commence upon approval of the contract by the Trustees, and as stated in the Notice to Proceed. All work under the Contract must be substantially complete on or before October 1, 2024. Damages in the amount of $500.00 per day will be assessed for each day the work remains incomplete. Each bidder shall accompany its bid with bid security, as defined in Section 468.35 of the Iowa Code in the amount equal to five percent of the total amount of the bid. The Drainage District Trustees reserves the right to reject any and all bids.

Bid Results

Water / Sewer

$213,299.00

Public - County

Site Work

13

6

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
34
Bidding Soon
577
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Nevada, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.