BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Fruita, Colorado. Conceptual plans call for site work for a water / sewer project.

Reference Number 0000340814 Question Acceptance Deadline 02/02/2024 12:00 PM MT Questions are submitted online No, All inquiries and requests for clarifications shall be submitted via email to Chris Dehmel at cdehmel@fruita.org or Steve Martinez at smartinez@fruita.org The City of Fruita is a growing community on the Western Slope of Colorado that has seen an increase in residential development over the past few years. A good portion of this growth has occurred east of the core area of the city. As such, more traffic is being directed away from established urban roads towards roads that are more suited to rural traffic loads. In particular, 19 Rd. from Highway 6 & 50 has seen an uptick in traffic. It is anticipated that due to increases in residential subdivision applications and recent school changes, this corridor will see additional traffic in the near future. In order to accommodate the growth, the City is in the process of designing improvements to the existing road section and utility infrastructure on 19 Rd. Included in the design are irrigation, storm drainage and sewer infrastructure improvements as well as road widening. It is anticipated that construction of these improvements will begin in late fall/early winter of 2024. One of the major infrastructure issues that the City faces is the current box culvert that passes the Independent Ranchman's Canal under 19 Rd. from east to west. The culvert is older and somewhat deteriorated, and is too narrow to accommodate the proposed lane changes. It is the City's intention to remove the existing culvert structure, construct new utilities and sleeves for future utilities under the alignment following the removal, and then to install a new box culvert wide enough to accommodate the proposed road section. The City of Fruita has budgeted $6,000,000 for the project in 2024. This amount includes funding for design and engineering services encompassed by this RFQ/P as well as construction. Owner reserves the right to reject any or all Proposals.

Conceptual

Water / Sewer

$6,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
2
Bidding Soon
67
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2025

img_map_placeholder

19 Rd, Fruita, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.