Site work for a water / sewer project in Colorado Springs, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000340760 construction of a new storm sewer line in the area of the East Ute Valley Trail at Garden of the Gods Question Acceptance Deadline 02/05/2024 02:00 PM MT All questions shall be submitted electronically All questions must be received no later than Requests for Information, support and questions shall be directed to: Alyssa Lee Alyssa.Lee@ColoradoSprings.gov The Contractor shall complete all work within 180 Calendar Days after the Notice to Proceed. The Contractor shall start work promptly after receipt of the Notice to Proceed and Pre Construction Meeting and continue to work diligently until all work is completed and accepted by the City. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % If the total amount of the accumulative Bid is more than $50,000, or a bond is required elsewhere in this IFB, the Bidder is required to furnish with their Bid a bid security in the form of a bank certified check, bank cashier's check or a one-time bid bond underwritten by a company licensed to issue bonds in the State of Colorado and acceptable to the City in an amount equal to at least 5% of the total amount of the Bid payable without condition to the City For contracts in excess of $50,000, the Contractor shall furnish to the City each of the following: a Performance Bond, a Labor and Materials Payment Bond, and a Maintenance Bond. Each such bond shall be in the amount of one hundred percent (100%) of the contract price. The City reserves the right to reject any or all Bids and to waive informalities and/or irregularities in a Bid. Whether or not a contract is awarded as a result of this Invitation for Bid, as stated above, Bid preparation costs are not reimbursable Estimated Project Magnitude: $175,000 - $275,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$214,551.00

Public - City

Site Work

15

8

2

6

Subscribe For Documents

114 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
31
Bidding Soon
685
All Active Projects
289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

March 18, 2024

img_map_placeholder

Ute Trail, Colorado Springs, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.