Published April 3, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Joliet, Illinois. Completed plans call for the renovation of a water / sewer project.

Any questions or clarifications concerning these specifications should be in writing and directed to the Purchasing Division at purchasing@joliet.gov. Prospective bidders are required to complete and submit a technical prequalification questionnaire with supporting documents to the City of Joliet (see Instructions to Bidders). Technical prequalification forms will be provided with bidding documents. Completed forms are to be submitted no later than 10:00 A.M. local time on February 20, 2024. The City of Joliet, Illinois, does hereby invite sealed bids for the replacement of MCCs at the City's Eastside WWTP and the water SCADA system as specified in the Eastside WWTP MCC Replacement and AWSP, JOL0801-SCADA System Upgrades project. The work consists of replacing four MCCs at the City's Eastside WWTP, PLC upgrades at the Eastside and Aux Sable WWTPs, and replacing existing Bristol-Babcock Controlwave Micro controllers at approximately 33 sites, including the master, with Allen Bradley controllers, replacing miscellaneous instruments at several sites, and reconfiguring the existing 4RF Aprisa SR+ licensed frequency radios from serial to Ethernet communication Question Deadline 02/22/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing.

Award

Water / Sewer

$4,480,000.00

Public - City

Renovation

53

26

6

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Fibrous Reinforcing, Cast-in-Place Concrete, Cast Decks and Underlayment, Concrete Topping
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping, Joint Protection
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Painting and Coating, High-Performance Coatings, Marine Coatings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Storage Specialties, Lockers, Postal Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furnishing Accessories, Clocks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
175
Bidding Soon
2,138
All Active Projects
1,076
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

April 11, 2024

img_map_placeholder

Multiple Locations, Joliet, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Eastside WWTP MCC Replacement and AWSP

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.