BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a playground / park / athletic field in Central Point, Oregon. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

This project consists of replacement of the existing flagpole and electrical and lighting improvements at Robert J. Pfaff Park. This work will include: demolition work to remove existing light poles and a flagpole; construction of a new flagpole; lighting improvements including installation of flagpole lighting, pathway light poles, perimeter light poles, and the addition of pole heads to the existing tennis court lights; electrical improvements including replacement of an overheard electrical service line with a new underground line, transformer vault, breaker panels and receptacles, power pedestals to supply power for food carts and other vendors, electrical lines and handholes throughout the site. This is a City funded project. Work shall begin no earlier than February 26, 2024, and must be completed by June 1, 2024. Question Deadline 02/16/2024 Please direct all questions to Greg Graves, Project Manager at 541-423-1022 or greg.graves@centralpointoregon.gov. No bid will be received or considered by the City of Central Point unless bidder signs the bid statement. The contract is for public work subject to ORS 279C.800 to 279.870. This project is subject to Oregon prevailing wage rates. The City of Central Point may reject any bid not in compliance with all public bidding procedures and requirements and may reject for good cause any or all bids upon a finding by the City of Central Point that it is in the public interest to do so Bidders must be prequalified in order to be eligible for award. Pre-qualification may be with the City of Central Point, City of Medford, or the Oregon Department of Transportation. If the bidder is disqualified in any of these jurisdictions, the bidder will be ineligible for this contract. Award of contract will not be final until the later of: 1) three (3) business days after the City of Central Point announces Notice of Intent to Award; or 2) the City of Central Point provides a written response to each timely protest, denying the protest and affirming the award. On all projects, work performed by the Contractor's own organization must be at least 30% of the awarded contract amount Est. Value: $ 140,000.00 Est. Completion Date: June 1, 2024 Pre-Qualification: Yes

Award

Playgrounds / Parks / Athletic Fields

$150,000.00

Public - City

Outdoor Lighting, Site Work

11

5

4

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
2
Bidding Soon
80
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

February 26, 2024

img_map_placeholder

635 Manzanita St, Central Point, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.