BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a mixed-use development in Cave Spring, Virginia. Completed plans call for the demolition of a educational facility; for site work for a educational facility; and playground / park / athletic field.

**As of March 15, 2024, this project has been awarded to Sampson Construction, awarded amount not available.** Retaining Wall Replacement - Hidden Valley High School Baseball Field. Provide all labor and materials to replace retaining wall according to the following specifications: -Work to begin after June 15, 2024 and conclude by July 31, 2024. Work may begin earlier at the conclusion of the HVHS baseball season. -Penalty of 1% per week if not completed by July 31, 2024. -Wall Height = 68" above grade, including cap -Wall Length = 160' -Demolition and disposal of existing timber wall -Excavation to end of geogrid -Storing excavated spoils on site for reuse -Segmental Block as Gray Allan Block or equivalent -Caps -Geogrid -Footer excavation -Placement and compaction of fill to end of geogrid and to bottom of soil cap -Stone drain field 12" behind wall for full height and length specified -Drain tile (4" corrugated pipe) for full length of wall -Placement of soil slope above reinforced zone using excavated spoils -Seed and straw disturbed areas -Include crushed stone backfill as needed The retaining wall at the baseball field at Hidden Valley High School is collapsing and needs to be replaced. The School Board further reserves the right to reject any proposal if the evidence submitted by, or investigations of, such Offeror fails to satisfy the School Board that such Offeror is properly qualified to carry out the obligations of the contract and to provide the services and/or furnish the goods contemplated therein. Questions which may arise as a result of this solicitation may be addressed to Todd Kageals, tkageals@rcps.us, 540-562-3900 at least seven (7) business days prior to the due date.

Award

Educational

$600,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
48
Bidding Soon
672
All Active Projects
351
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 9, 2024

March 8, 2024

img_map_placeholder

5000 Titan Trail, Cave Spring, VA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.