BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Forest, Mississippi. Completed plans call for the renovation of a military facility.

Replacement of an Air Conditioner Unit on a modular office building at the Bienville Ranger District Office. Remove old HVAC unit. Install new 3-ton 208/230V,1ø,60H AC, and 240 VAC 10 KW 41.6-amp 60H manufactured home vertical wall mount heat pump with secondary heat strips HVAC unit. Cleanup the work area. Remove trash and old HVAC unit from the Forest Service property. See SOW Delivery: 10 Days After Award Period of Performance: 02/19/2024 to 04/30/2024 Replace an air conditioner unit on a modular office building at the Bienville Ranger District office. See attached description of work for more details. The District Office location is at the Bienville National Forest in Scott County. Legal description: Forest, MS Quad; Sec.15, T6N, R8E. The directions for finding the District Office are to take Interstate 20 to Forest/Raleigh exit 88 at Forest, MS. At the Forest exit, take State Route 35 north and continue for two miles. The entrance to the office will be on your right. This project will involve the removal of an old HVAC unit and the installation of a new HVAC unit on a manufactured home on the southwest corner of the manufactured home portion of the ranger office

Award

Military

$9,985.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
56
Bidding Soon
639
All Active Projects
278
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 9, 2024

February 19, 2024

April 30, 2024

img_map_placeholder

3473 MS-35, Forest, MS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.