BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Mount Olive, Mississippi. Completed plans call for site work for a water / sewer project.

Contract B - Tank Rehabilitation Project For questions regarding the website, you may contact Plan House at 662-407-0193. SCOPE: Base bid for project includes a new painting and repairing an existing elevated storage tank. The work shall be for a complete operational project as per the drawings and specifications. Additionally the project has Additive Alternate Bids for Painting and Repair of one of Okatoma WA's existing elevated water tanks and pressure washing two of Okatoma WA's existing elevated water tanks. The work to paint and repair and pressure washing the existing elevated water tanks shall be as specified in the technical specifications and as referenced in the included Inspection report. 1.02 PROJECT SUPERINTENDENT: The Contractor will designate one qualified individual as Project Superintendent who will remain on the job at all times to supervise and coordinate the work until the project is completed. 1.03 RECORD KEEPING: A. The Contractor shall maintain a daily report indicating a description of trades working on the project; the number of personnel working; weather conditions encountered; and any delays encountered. These records shall include a statement that equipment and materials incorporated in the work and workmanship comply with the contract. The original and one copy of these records in report form shall be furnished to the Engineer or Resident Inspector daily within 24 hours after the date(s) covered by the report, except that reports need not be submitted for days on which no work is performed. As a minimum, one report shall be prepared and submitted for every seven days of no work and on the last day of a no work period. All calendar days shall be accounted for throughout the life of the contract. The first report following a day of no work shall be for that day only. Reports shall be signed and dated by the Contractor's Superintendent. The report form the Superintendent shall include copies of all test reports. Sample form enclosed. 1.04 Contractor is to furnish all labor, materials, tools, equipment, business license and full time supervisors to complete the project as called for in the Contract Documents and noted on Construction Drawings. 1.05 Contractor is responsible for visiting the site to become familiar with existing conditions. 1.06 The Contractor will warrant all materials and labor for a period of one (1) year for all work performed by the Contractor or Subcontractor unless otherwise specified

Bid Results

Water / Sewer

$224,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
24
Bidding Soon
256
All Active Projects
108
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

April 4, 2024

img_map_placeholder

To Be Determined, Mount Olive, MS

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.