Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a transportation facility in Charlotte, North Carolina. Working plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.
Charlotte Douglas International Airport ("CLT" or "Airport"), which is owned and operated by the City of Charlotte, North Carolina, will be soon be advertising bids for multiple packages on the Fourth Parallel Runway Program. This information session is to raise contractor (including subcontractor) awareness about the upcoming ITBs to be solicited. This program includes the planning, design, and construction of a 10,000-foot parallel runway and associated taxiway system to include the North End Around Taxiway Phase II and South End Around Taxiway. The 2016 Airport Capacity Enhancement Plan and 2018 FAA-approved forecast show the need for an additional runway at CLT. This runway will replace the existing crosswind runway and enhance capacity as the parallel configuration will provide greater operational benefit for more efficient air traffic flow into and out of CLT. West Boulevard will need to be relocated to Piney Top Drive and Byrum Drive in order to create space for the 4th Parallel Runway and South End-Around Taxiway. Intersection improvements and roadway widening will occur at various locations along the corridor. As part of the Fourth Parallel Runway Program at CLT, this construction package will include the construction of new Runway 1C-19C and its connector taxiways. The project includes erosion and sedimentation control, grading, drainage, fencing, vehicle service roads, miscellaneous utilities, airfield concrete and asphalt paving, marking, airfield lighting/signage, and approach lighting infrastructure. As of March 1, 2024, information regarding a design team is not available. This project is anticipated to advertise for bids in August 2024. A firm timeline for construction has not been determined.
Final Planning
Transportation Terminals
$30,000,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2024
To Be Determined, Charlotte, NC
Related To This Project
Charlotte, NC
--
Charlotte, NC
--
Charlotte, NC
Bid Date: Feb 26 2024
Charlotte, NC
Bid Date: Nov 14 2024
Charlotte, NC
Bid Date: Feb 25 2021
Charlotte, NC
Bid Date: Jul 31 2020
Charlotte, NC
Bid Date: May 13 2021
Charlotte, NC
Bid Date: Feb 27 2024
Charlotte, NC
Bid Date: Feb 22 2024
Charlotte, NC
Bid Date: Feb 26 2024
Charlotte, NC
Bid Date: Feb 28 2024
Charlotte, NC
Bid Date: Feb 14 2024
Charlotte, NC
--
Charlotte, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.