BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, new construction and addition to a mixed-use development in Manvel, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the construction of a water / sewer project; for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

planning to expand its Central Water Reclamation Facility (Central WRF) from an average daily flow (ADF) capacity of 0.5 million gallons per day (MGD) to 1.5 MGD and increase the peak 2-hour (P2H) flow capacity from 2.0 MGD to 6.0 MGD. The project consists of the addition of a new 1.0 MGD ADF Membrane Bioreactor (MBR) train to the Central WRF for the capacity expansion. Scope of work includes the following: New Coarse Screen and Lift Station: One (1) mechanical coarse screen, screenings processing equipment; Three (3) submersible pumps, piping, valves, monorail; and other appurtenances. New Headworks: One (1) gravity-vortex grit removal system, One (1) grit pump, grit processing equipment; two (2) rotary drum fine screens, two (2) screenings conveyor; and associated piping, valves, gates and other appurtenances. New Odor Control System: One (1) biofilter type odor control system consisting of air supply fan, pre-filter, recirculation pumps, biofilter, and associated piping, valves, and other appurtenances. New Membrane Bioreactor (MBR) System: Three (3) submersible pumps in equalization (EQ) basin, coarse bubble diffusers in EQ basin, two (2) submersible mixers in anoxic basins, fine bubble diffusers in pre-aeration basins, membrane modules in three (3) membrane basins, three (3) submersible Return Activated Sludge (RAS) pumps, two (2) Waste Activated Sludge (WAS) pumps, four (4) permeate pumps, four (4) membrane tank blowers, four (4) EQ/pre-aeration tank blowers, skid-mounted peristaltic chemical feed system, four (4) turbidity analyzers, piping, valves, gates, and other appurtenances. New Ultraviolet (UV) Disinfection System: Two (2) vertical UV modules, finger weirs, coarse bubble diffusers, parshall flume, canopy, piping, valves, gates, and other appurtenances. New Non-Potable Water (NPW) System: One skid-mounted NPW system consisting of three vertical multistage centrifugal pumps, bladder-type hydropneumatics tank, self-backwashing strainer, flowmeter, piping, valves, and other appurtenances. New Aerobic Digesters: Two (2) aerobic digester basins including coarse bubble diffusers, three (3) rotary lobe blowers, piping, valves, gates, and other appurtenances. New Dewatering Building: New building consisting of two (2) digested sludge feed pumps, one (1) polymer blending unit, one (1) belt-filter press, one (1) conveyor, tote spill containment, piping, valves, and other appurtenances. New Administration Building: New administration building including electrical and maintenance rooms. Electrical and Instrumentation: Electrical and instrumentation required for the construction and operational completion of the above improvements. Works consists of duct banks, power and control wiring, instrumentation, and site lighting. SCADA: Overall plant wide SCADA improvements. Yard Piping: Overall yard piping including valves, manholes, drains, NPW piping, cleanouts etc. New Generator: One (1) new 1500 kW natural gas engine generator. Site Civil: Overall site grading, paving, earth work, seeding and hydro mulching, plant outfall, landscaping, SWPPP, haul off native excavated materials, and other associated improvements. The deadline to ask questions is 03/18/2024 at 2:00 PM CT All Proposals shall be accompanied by a cashier's or certified check drawn on a state or local bank in the amount of five percent (5%) of the total maximum proposed price, and payable without recourse to the City of Manvel, Manvel, Texas, or a Proposal Bond in the same amount from a reliable surety company authorized to do business in the State of Texas, as a guarantee that the Responder will enter into a Contract. The successful responder must furnish a Performance Bond and a Payment Bond in the amount of one hundred percent (100%) of the Contract Price and upon the forms which are attached hereto. The City reserves the right to reject any proposal and to waive informalities in the proposals. In case of ambiguity or lack of clearness in stating the prices in any proposal, the City reserves the right to consider the most advantageous construction thereof, or to reject the proposal. The award shall be made to the most responsible Responder submitting the lowest acceptable proposal.

GC Bidding

Water / Sewer

$27,900,000.00

Public - City

Addition, Demolition, New Construction, Paving, Site Work

377

63

62

7

Subscribe For Documents

142 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
191
Bidding Soon
3,961
All Active Projects
1,634
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.