BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Lansing, Michigan. Completed plans call for the renovation of a municipal facility.

Question Deadline 07/23/2024 at 12:00 PM ET The work, Constitution Hall - Replace Roof includes, but is not necessarily limited to the installation of new roof insulation and fully adhered EPDM roofing system, adjustment to fall protection system and replacement of solar control film at Atrium south curtain wall glazing. The Bidding Documents include either the attached Schedule of prevailing rates of wages and fringe benefits for all classes of Construction Mechanics called for in the Bid and resulting Contract, if any, or the attached current prevailing wage determination issued by the U.S. Department of Labour, as applicable depending on the funding source(s).Federal Prevailing Wages -The federal prevailing wage requirements in the attached Federal Provisions Addendum apply when the Davis-Bacon Act (40 USC 3141-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, "Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction") applies. Each Bid shall enclose Bid Security, as specified in Section 00100 Instructions to Bidders (and as specified in Section 00310 Bid Bond, if a Bid Bond is enclosed), in the amount of five percent (5%) of the Bidder's Base Bid. If Bid Security is by check or money order, such certified or cashier's check or money order must be delivered in original Any failure of a Bidder to take the actions described and acknowledged in this Article will not relieve that Bidder of the responsibility for (a) properly estimating the difficulty, cost of and schedule for successfully performing and order drawn upon a bank insured by an agency of the Federal Government or consist of a duly executed Bid Bond. The State reserves the right to cancel this Invitation to Bid (ITB) or change the date and time for submitting Bids by announcing same at any time before the established date and time for Bid opening. Bids must remain open for acceptance by the Owner for no less than the Bid hold period. Contractor may agree to extend the Bid hold period. However, any such extension must be based upon no increase in the Bid Price and/or Contract Time.

Bid Results

Municipal

$2,533,100.00

Public - State/Provincial

Renovation

11

10

12

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
72
Bidding Soon
1,328
All Active Projects
548
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

August 30, 2024

img_map_placeholder

525 W Allegan St, Lansing, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.