Site work for a water / sewer project in Centerville, Indiana. Completed plans call for site work for a water / sewer project.

1.01 SCOPE of WORK Tank Information: East Tank: The structure is a 250,000-gallon elevated water storage tank with a low-water level of 102 ft. 5 in. located at 209 N. 4 th Street in Centerville, Indiana. West Tank: The structure is a 250,000-gallon elevated water storage tank with a high-water level of 119 ft. 4 in. located at 407 Short Street in Centerville, Indiana. The work includes: East Tank: Exterior: Abrasive blast clean to a SSPC-SP6 commercial standard with containment. Apply a four (4) coat zinc epoxy urethane system. Wet Interior: Abrasive blast clean to a SSPC-SP10 near-white metal standard. Apply a three (3) coat zinc epoxy system. Foundation: Abrasive blast clean and apply a two (2) coat epoxy system. Mixer: Install a mechanical mixer. Repairs: 1) Install riser manway. 2) Replace the wet interior roof hatch. 3) Overflow discharge modification. 4) Replace the exterior overflow pipe supports. 5) Install a fall prevention device on the wet interior ladder. 6) Install a roof/sidewall platform. 7) Ladder cage removal and install a vandal guard. 8) Balcony drain holes. 9) Install a swing gate at the balcony opening. 10) Replace roof vent with a pressure vacuum vent 11) Install cathodic clips and pressure fitting. 12) Install a roof handrail with a painter's railing. 13) Install bowl rigging couplings. 14) Install a riser handrail. 15) Adjust the loose sway rods. 16) Remove the damaged section of the wet interior painter's railing. 17) Remove an abandoned antenna cable. West Tank: Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Foundation: Water clean and apply a two (2) coat epoxy system. Cathodic Protection: Install an impressed current cathodic protection system. Repairs: 1) Install a gasket on the wet interior roof hatch. 2) Install handholds at the roof hatch. 3) Overflow discharge modification. 4) Adjust the fall prevention device on the leg ladder. 5) Remove the bottom section of the leg ladder. 6) Install a roof/sidewall platform. 7) Balcony drain holes. 8) Balcony access modification. 9) Replace roof vent with a pressure vacuum vent. 10) Install a roof handrail with a painter's railing. 11) Install bowl rigging couplings. 12) Adjust the loose sway rods. 13) Install a wet interior ladder

Bid Results

Water / Sewer

$631,180.00

Public - City

Site Work

6

17

8

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
35
Bidding Soon
1,168
All Active Projects
463
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

April 22, 2024

img_map_placeholder

Multiple Locations, Centerville, IN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.