BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a laboratory facility in Columbia, Missouri. Completed plans call for the addition of a laboratory facility; for the demolition of a laboratory facility; and for site work for a laboratory facility.

This project will consist of an approximately 8,000 square foot facility addition to the West side of the MURR Reactor Building, a renovation of adjacent space within the Reactor Building, and a renovation of existing space within the Main Industrial Building. The first floor of the addition and renovation spaces will house new hot cell lines for increased production. The addition will include a second floor for hot cell maintenance access and a penthouse for mechanical equipment as well as supplies storage. The project will be delivered as a Construction Manager at Risk (CMR) project due to the size, complexity, and schedule requirements of the project. A CMR will provide preconstruction services for the project (cost estimating, schedule, identify long lead items and procurement strategies, value engineering and constructability). The project will be completed in three phases and is expected to be operational as follows: 3rd Level Target Capacity Line Construction Substantial Completion in January 2025 and 4th Level Target Capacity Line Construction Substantial Completion January 2026. The GMP is estimated at $11,000,000. The CMR is required to substantially complete the last phase no later than January 30th, 2026. This project shall have a Supplier Diversity participation goal of 10% Minority Business Enterprise (MBE), 10% Women Business Enterprise (WBE)//Disadvantage Business Enterprise (DBE), and a 3% Veteran/Service-Disabled Veteran (SDVE) of the GMP. The Construction Manager at Risk is strongly encouraged to include minority and women owned firms. CMRs are also strongly encouraged to include Missouri-based firms on the team. The method of Contractor Selection has not been Determined at this time.

Post-Bid

Laboratories

$11,000,000.00

Public - State/Provincial

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
25
Bidding Soon
335
All Active Projects
131
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2024

October 2, 2024

img_map_placeholder

1513 Research Park Dr, Columbia, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.