BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2025 at 7:00 PM

Updated January 10, 2025

Site work and paving for a civil project in Phoenix, Arizona. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction services and complete construction services for the Rio Reimagined: 3rd Street Rio Salado Bicycle/Pedestrian Bridge project. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. The bridge project site is located across the Rio Salado/Salt River along the 3rd Street alignment, extending from south of University Drive to the existing southern bank pathway. The estimated construction cost is $23 million. The Rebuilding American Infrastructure with Sustainability and Equity (RAISE) Grant project will connect the underserved South Phoenix community to transportation, housing, education and employment opportunities. The full scope of the Rio Reimagined: 3rd Street Rio Salado Bicycle/Pedestrian Bridge project, will consist of constructing a bicycle and pedestrian bridge across the Rio Salado/Salt River along the 3rd Street alignment and add low-emitting solar pedestrian-scale lighting and pathway amenities to the existing asphalt pathway along the southern bank between Central Avenue and the City’s eastern border limits at 40th Street. See Exhibit E for project location. The Construction Manager at Risk will begin with the firm in an agency support role for preconstruction services. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods, and will be required to solicit bids from prequalified subcontractors to perform the work using the City’s subcontractor selection process. The CMAR may also compete to self-perform limited amounts of work. (or for horizontal work) For this project the CMAR is responsible for self-performing a minimum of 45% of the construction work as measured by total contract price for construction. The GMP must be submitted in MAG or CSI format or it will not be accepted. Last day for questions December 3, 2024 Questions. Questions pertaining to this selection process or contract issues should be directed Contracts Specialist, Annette Perez at (602) 273-3488 or email annette.perez@phoenix.gov. City Rights. The City of Phoenix reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received.

Award

Bridges / Tunnels

$23,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

June 25, 2025

Project location map

3rd St., Phoenix, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.