Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Norfolk, Virginia. Completed plans call for site work for a water / sewer project.
Question Submission Deadline:March 21, 2024, 5:00pm Question Response Deadline:March 25, 2024, 5:00pm Questions shall be submitted through the Questions and Answers tab in the electronic solicitation posting for RFP No. 9899-0-2024/M or online The purpose of this RFP is to obtain an Advanced Metering Infrastructure ("AMI") System including, but not limited to, water Meters, AMI data collection system, Meter installations, hosted AMI software, system integration, training, scheduling, and Project management. The proposed Solution may be either a fixed network or a Network-as-a-Service ("NaaS") offering. The City of Norfolk (the "City") also desires to obtain manual Meter Reading Services to aid in the transition to new AMI. A plan to transition manual Meter Reading Services from the current contractor to the AMI contract will be developed as part of the Project start up. The City's Meter inventory consists of approximately 70,000 Meters, the majority of which are manufactured by Neptune, with the T-10 model being the most common. The Meters are predominantly 5/8-in in size (86%) serving residential and small commercial accounts. Meters larger than 2" are typically turbine Meters, with a mix of the Neptune HP and Sensus Omni models. Several of the larger Meters (10, 12 and 16-inch) are used for master Meter billing and industrial customers. The average age of all Meters is estimated to be 7.5 years. The vast majority of existing Meters are outfitted with a Neptune direct-read (manual) register which are read by a service provider. The Contractor shall provide all products and Services described within this RFP required to achieve a fully functional AMI system meeting the requirements described within this RFP. The Contractor shall also provide Meter Reading Services throughout the duration of this implementation Project as required to transition the City from manual meter reads to the AMI.
Post-Bid
Water / Sewer
$750,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2024
April 10, 2024
Multiple Locations, Norfolk, VA
Related To This Project
Norfolk, VA
Bid Date: Feb 22 2024
Norfolk, VA
--
Norfolk, VA
Bid Date: Feb 26 2024
Norfolk, VA
--
Norfolk, VA
Bid Date: Feb 21 2024
Norfolk, VA
--
Norfolk, VA
Bid Date: Mar 04 2024
Norfolk, VA
Bid Date: May 03 2019
Norfolk, VA
Bid Date: Jan 02 2019
Norfolk, VA
Bid Date: Mar 05 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.