BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 1, 2024 at 7:00 PM

Updated March 2, 2024

Site work and paving for a mixed-use development in Buffalo Grove, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

City/County - Lake This project will reconstruct Arlington Heights Road between IL Route 83 and Lake-Cook Road. Existing concrete pavement will be replaced with new HMA pavement. Additional improvements include channelization improvements at Fremont Way, replacing storm sewer, widening Checker Road, filling a sidewalk gap between Brittany Lane and Checker Road, replacing traffic signal equipment, and other related work. The south end of the project terminates at the northern edge of the intersection of Lake Cook Road and Arlington Heights Road. The north end of the project terminates approximately 500 ft north of the intersection of Arlington Heights Road and IL-83 (McHenry Road). Project Location: Lake Cook Road and Arlington Heights Road Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. ILDOT - Arlington Heights Road - 17-00193-08-PV

Award

Roads / Highways

$15,626,272.00

Public - County

Paving, Site Work

540

6

44

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
290
Bidding Soon
3,790
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

April 12, 2024

Project location map

Lake Cook Rd & Arlington Heights Rd, Buffalo Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.