EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 3, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Florence, Kentucky. Completed plans call for site work for a water / sewer project.

This project shall include all material, labor, equipment and installation required to complete all element(s). Bond Notes: Each sealed bid shall be accompanied by either a cashier's check or satisfactory bid bond, in a sum, which is not less than five (5%) percent of the aggregate amount of the bid, payable to the City of Florence. Successful bidder will be required to execute and to provide construction contract security in an amount not less than one hundred percent of the bid. All bids must be made on the required Bid Form. Two completed copies of the Bid Form are required. Contractors shall register with Viox & Viox, Inc. to qualify as a bidder. No substitution of Contractors shall occur without change of registration. Doc Notes: Viox will waive any additional charges for mailing and handling. Questions from contractors during the bidding process should be submitted in writing, via email or fax, to Viox & Viox, Inc., SUBJECT: COF- RIDGE VIEW AVENUE AND CHIPMAN DRIVE WATER MAIN IMPROVEMENTS. Send email tosmcmillan@vioxinc.com and dmichels@vioxinc.com or Fax to 859 727-8452, ATTN Sandy McMillan and Dominic Michels. Questions must be submitted no later than 48 hours prior to the bid date. Question Deadline 02/05/2024

Post-Bid

Water / Sewer

$393,000.00

Public - City

Site Work

8

7

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
84
Bidding Soon
1,295
All Active Projects
594
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, Florence, KY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Ridge View Avenue and Chipman Drive Water Main Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.