Site work for a playground / park / athletic field in Columbia, South Carolina. Completed plans call for site work for a playground / park / athletic field.

Project Specific Scope of Work A. Hyatt Park: a. Includes demolition of current concrete seat bleachers and installing new seat wall bleachers. b. Contractor is responsible for field staking all construction elements c. Score board building demolition d. Contractor shall provide shop drawings of all fence design details for review and approval e. Design and installation of a new playground f. Design shall be provided to the City's Project Manager for review and approval B. TS Martin Park: a. Install baseball fencing at an increased height to allow adult play b. Install four (4) new bleachers around baseball fields c. Contractor shall provide shop drawings of all fence design details for review and approval It is the goal of the City of Columbia, SC to maximize opportunities for historically Disadvantaged Enterprise Businesses (DBEs) including, but not limited to, Small Businesses (SBEs), Minority Businesses (MBEs), Women-Owned Businesses (WBEs). The City has implemented an overall citywide 15% goal to encourage socially and economically disadvantaged business participation. In an effort to encourage socially and economically disadvantaged business participation, this goal extends to Bidders, Offerors, Subcontractors and suppliers on its procurement and contracting offerings. Simultaneously with his delivery of the executed contract, the contractor shall furnish a surety bond or bonds in an amount at least equal to one hundred (100) percent of the amount of the contract price as security for the faithful performance of this contract and for payment of all persons performing labor on the project under this contract and furnishing materials in connection with this contract as specified in general specifications included herein. The surety bond, or bonds shall be executed by a company duly authorized to do business in the State of South Carolina and shall carry a minimum A.M Best Company rating of A- or greater. Said surety shall be subject to approval by the Owner's attorney. Simultaneously with his delivery of the executed contract, the contractor shall furnish a surety bond or bonds in an amount at least equal to one hundred (100) percent of the amount of the contract price as security for the faithful performance of this contract and for payment of all persons performing labor on the project under this contract and furnishing materials in connection with this contract as specified in general specifications included herein. The surety bond, or bonds shall be executed by a company duly authorized to do business in the State of South Carolina and shall carry a minimum A.M Best Company rating of A- or greater. Said surety shall be subject to approval by the Owner's attorney. Bidder must agree to commence work on or before a date to be specified in a written "Notice to Proceed" from the Owner and to fully complete the project within the number of consecutive calendar days thereafter as indicated on the Bid Form. Bidder must agree to pay as liquidated damages the sum of $250.00 per day as indicated in the Contract Documents for each consecutive day thereafter that the work remains incomplete. All Offerors must provide a copy of their South Carolina Contractors License with the bid and shall have the required classification for the scope of work. The Contractor, an employee of the Contractor, or a Subcontractor for the Contractor shall be a Certified Playground Safety Inspector. Question Deadline 02/09/2024 at 12:00 PM ET Questions must be submitted to electronically. A masterplan was created in 2016 for the revitalization of the entire 9 1/2 acres. Parks and Recreation would like install baseball fencing at an increased height to allow adult play on the fields, along with new bleachers around the baseball fields. The Community Development Block Grant (CDBG) is funding this project and work must be completed by June 30, 2024. In addition to this deadline, all CDBG guidelines will need to be carefully reviewed for proper project implementation. The Owner reserves the right to accept or reject the qualifications of any bonding company submitted by the Contractor. The budget range for the combined projects is $315,000.00 - $355,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Playgrounds / Parks / Athletic Fields

$355,000.00

Public - City

Site Work

5

5

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
35
Bidding Soon
732
All Active Projects
315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2024

March 18, 2024

img_map_placeholder

Multiple Locations, Columbia, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.