BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Columbus, Ohio. Completed plans call for the renovation of a clubhouse / community center; and playground / park / athletic field.

**As of April 19, 2024 project was awarded to General Maintenance & Engineering and JB roofing, awarded amount is $1,349,035.** MWBE Goal 15% Question Deadline 02/14/2024 at 5:00 PM ET Questions pertaining to the drawings, plans,specifications, IFB, and/or other contract documents must be submitted in writing to the Department of Recreation & Parks by email to cmscannell@columbus.gov and No phone calls will be accepted. Remove all dirt, grease, and loose or chalky mortar or paint by powerwashing and by using a stiff broom. Garlandis Clean Shield or EnviroKlean BioWash will be used during the powerwashing phase. See the BioWash product data sheet for application and dilution instructions. Repair loose or chalky mortar or paint as required Remove all existing vertical and horizontal joint sealants. Install new oversized backer-rod and install Greenlock XL. (GL XL comes in 20oz sausages and is easy to use. It is paintable but must be painted on the same day as install) Install Greenlock XL over each brick ibands/ledgesi and form a 45 angle so that any water running down the wall gets over the brick that extends out from the wall. Repair all cracks and fill in any holes in the masonry. Remove any signs, downspouts, etc.., coat behind them and then reinstall them. Seal around all cameras, lights, doors, etc.. Remove all window sealant and install new Tuff Stuff on the window frames that meet the structure. Then install All-Sil where the window frames meet the glass. Tape off any areas to avoid overspray from getting onto them. Tuff-Coat is ready to use as is; however, some slow stirring with a paddle may be necessary. Tuff-Coat can be applied by brush, spray, or roller, and the application rate varies according to the porosity of the surface. Apply two coats of Tuff-Coat at a rate of 150-200 sq. ft./gal (each coat) at 50 degrees and rising. The dry time to touch is 30m minutes, to re-coat is 2 hours, and to fully cure is 5 days. Three different colors of Tuff Coat will be used. Sandstone goes over the

Award

Clubhouse / Community Centers

$1,349,035.00

Public - City

Renovation

3

8

2

6

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
44
Bidding Soon
1,211
All Active Projects
397
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

March 25, 2024

img_map_placeholder

Multiple Locations, Columbus, OH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.