Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Egg Harbor City, New Jersey. Completed plans call for the renovation of a educational facility.
Scope of Work: Saw cut existing concrete floor slab to facilitate new plumbing work, in-fill with new concrete, vapor barrier, finish floor to match adjacent material / color. Temporarily remove, store indicated cabinets, reinstall after renovation work has been completed. Provide and install new acoustic ceiling tiles within the existing suspended grid system (to remain). Provide and install new gypsum board wall construction. Provide and install stainless steel sheet wall panels. All indicated casework. All plumbing, sprinkler, and electrical system work. (All work is as-indicated on the drawings.) Location- 1701 New York Avenue, Egg Harbor City, NJ 08215 DPMC Requirements: C009 Prime with C030, C042 & C047 Subs Project Start: 6/24/2024 Substantial Completion: 8/30/2024 Final Completion: 9/29/2024 Bid proposal shall be submitted in duplicate in a sealed envelope, addressed to the Owner (above), bearing the name and address of the bidder, and clearly marked "BID" with the contract title and project number on the outside of the envelope. Bid Proposal must be accompanied by a Certified Check, Cashier's Check or Bid Bond. Each proposal shall be accompanied by a Consent of Surety from a Surety Company stating it will provide each bidder with separate Performance and Payment Bonds, each in the amount of 100% of the contract sum. If the bid exceeds $20,000.00, bidder must be pre-qualified by the New Jersey Division of Property Management and Construction (DPMC), prior to date bids are received. Each proposal shall be accompanied by a Consent of Surety stating it will provide each bidder with separate Performance and Payment Bonds, each in the amount of 100% of the contract sum per N.J.S.A. 18A:18A-25. Bidding shall be in conformance with the applicable requirements of N.J.S.A. 18A:18A-1 et seq. the "Public School Contracts Law." All bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq., Affirmative Action Against Discrimination (N.J.A.C. 17:27-1 et seq.). This project is subject to the NJ State Prevailing Wage Act, N.J.S.A. 34:11-56.27 et seq. All bidders must comply with N.J.S.A. 10:5-31 et seq., N.J.A.C. 17:27 et seq. and N.J.S.A. 10:2-1. An Initial Project Workforce Report will be required from the successful contractor. (Form AA-201). Per N.J.S.A. 52:32-44, contractors and subcontractors must provide a Business Registration Certificate issued prior to the award of contract. The Board of Education and the Architect assume no responsibility for bids mailed or misdirected in delivery. No bid may be withdrawn for a period of sixty (60) days after the date set for the opening thereof. The right is reserved to reject all bids or to waive minor informalities in the bidding if it is in the interest of the Owner to do so. All requests for information (RFI) must be submitted in writing by February 8, 2024, and sent to info@fvhdpc.com or fax to 609-883-2694 or via common carrier to the Architect. 1. Cedar Creek High School: a. Saw cut existing concrete floor slab to facilitate new plumbing work, infill with new concrete, vapor barrier, finish floor to match adjacent material / color, and all associated work, as indicated on the drawings. b. Temporarily remove, store indicated cabinets, reinstall after renovation work has been completed and all associated work. c. Provide and install new acoustic ceiling tiles within the existing suspended grid system (to remain), and all associated work. d. Provide and install new gypsum board wall construction, where indicated on the drawings. e. Provide and install stainless steel sheet wall panels, where indicated on the drawings. f. All indicated casework g. All plumbing, sprinkler, and electrical system work, as indicated on the drawings. h. All other indicated work. Single Overall Contract: This contract includes: 1. All work in accordance with drawings, Parts 2, 4 and 6 Specification Sections in accordance with Contract Documents. 2. General Construction Work includes: a. Work that is primarily architectural and civil in nature plus work traditionally recognized as general construction in accordance with drawings and as listed as a part of Part 2 specification sections, unless otherwise indicated below: 1) Also includes both administrative and coordination responsibilities. a) General Construction Contractor is responsible for all coordination between his/her work and work of all Prime Subcontractors. 2) All initial excavation inside the building, and the preparation of the subbase under the concrete slab. 3) All earthwork, site utility work outside the building, as specified in Part 2 specification sections. 4) All concrete work in accordance with Part 2 specification sections excluding concrete padsshown on electrical drawingsfor electrical work. 5) Provide and install the metal fabrications in accordance with Division 2 Sections. 6) All other indicated work. 3. Plumbing, Drainage and Sprinkler System Work includes: a. Piping servicing domestic water piping, gas piping, drainage and sprinkler systems and connection of equipment tied into the above types of systems and including all work in accordance with drawings and Part-4 specification sections. 1) Work shall include demolition and removals, as indicated or required, to allow for new construction. 2) Work shall include reinstallation, cutting, patching, finishing and repair work associated with Plumbing, Drainage and Sprinkler system work, as indicated or required, including cutting, alterations, and replacement work, where indicated or required. b. Subsequent excavation, backfill and compaction of trenches after the work of the General Construction Work, as required by the installation of plumbing utilities inside the building. Work shall be performed in accordance with requirements of Part-2 Specification sections. 4. Electrical Work includes: a. The work necessary for electrical power distribution, lighting, and the connections to equipment tied into such systems, including all work in accordance with drawings and Part-6 specification sections. 1) Work shall include power distribution and wiring for all indicated electrically operated equipment and fixtures, (in Parts 2, 4, 5 and 6), whether shown or not on drawings. 2) Work shall include demolition and removals, as indicated or required, to allow for new construction. 3) Work shall include reinstallation, cutting, patching, finishing and repair work associate with Electrical work, as indicated or required, including performing work at existing roof(s); cutting existing roof decking, and all other roof flashing work: a) Roofing work shall be performed in accordance with requirements of existing roofing system's warranty and the Contract Documents. b. Subsequent excavation, backfill and compaction of trenches after the work of the General Construction, above, as required by the installation of electrical utilities inside the building. Work shall be performed in accordance with requirements of Part-2 Specification sections. Physical work at the site shall commence on or about June 24, 2024. Final completion- October 16, 2024. b. Liquidated Damages - $2,000.00 / Calendar day of delay.
Award
Educational
$1,336,200.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2024
June 24, 2024
1701 New York Ave, Egg Harbor City, NJ
Related To This Project
Egg Harbor City, NJ
Bid Date: Feb 08 2024
Egg Harbor City, NJ
--
Egg Harbor City, NJ
Bid Date: Mar 09 2021
Egg Harbor City, NJ
--
Egg Harbor City, NJ
Bid Date: Dec 05 2023
Egg Harbor City, NJ
Bid Date: Oct 03 2023
Egg Harbor City, NJ
Bid Date: Jun 01 2023
Egg Harbor City, NJ
--
Egg Harbor City, NJ
Bid Date: Mar 08 2023
Egg Harbor City, NJ
Bid Date: Feb 16 2023
Egg Harbor City, NJ
Bid Date: Feb 02 2023
Egg Harbor City, NJ
Bid Date: Nov 24 2020
Egg Harbor City, NJ
Bid Date: Aug 11 2022
Egg Harbor City, NJ
Bid Date: Dec 16 2021
Egg Harbor City, NJ
Bid Date: Nov 04 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.