BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2024 at 8:00 PM

Updated March 13, 2025

Site work and paving for a civil project in Pueblo, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of 2/16/2024: The city extended the bid date from February 21 to February 23 at 10:30 am (MT) as per addendum 1 however, there is no official addendum document available. No Bidder will be heard after the opening of bids to assert that there was any misunderstanding as to the nature of the operation expected in this solicitation. If a pre-bid meeting is held, Bidders should make every effort to attend. If the pre-bid meeting is mandatory and the Bidders cannot attend, it is imperative that someone else attend as a representative of the company, otherwise, their bid will not be accepted at the time of bid opening. Bidders must follow the submittal procedures outlined in the documents. The City reserves the right to reject any or all bids for any or all items covered in the Invitation for Bid, to waive informalities or defects in bids, or to accept such bids as it shall deem to be in its best interest. In general, this project will consist of asphalt mill and overlay, crack repair, and sanitary sewer large main removal and replacement on Dillon Drive from the north side of existing railroad bridge to the future roundabout at Eagleridge Boulevard and Dillon Drive, as detailed in the plans and specifications for this project. Question Submission Deadline February 13, 2024, 4:00pm Bid Results Asphalt Improvements Pyramid Construction, Inc. :- $475,932.60 Sanitary Sewer Improvements Pyramid Construction, Inc. :- $293,450

Award

Roads / Highways

$769,383.00

Public - City

Paving, Site Work

16

10

7

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
0
Bidding Soon
218
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2024

May 1, 2024

Project location map

Dillon Dr, Pueblo, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.