Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Saint Louis, Missouri. Completed plans call for site work for a educational facility; and playground / park / athletic field.
Playground Expansion at Forest Park Campus The College has the proposed minority goals MBE 15% and WBE 12%. Also proposed for Contractors to participate in a registered Apprenticeship Program approved through the United States Department of Labor. Individuals with special needs as addressed by the ADA may contact: 314- 984-7673 Questions Regarding the Scope of Work Should Be Directed to Jeff Blankenship at Jblankenship32 @stlcc.edu Question Deadline 02/13/2024 All grading necessary to install proposed new surfaces at 2% or less slope. All spoils left on site and graded out. Concrete flat work 3000sf colored concrete at Gathering area/garden area 3100 sf of sidewalks and concrete slab for shed. 440'+/- concrete curbs for synthetic turf areas and PIP Hardscape areas Nature art 600 sf +/- Belgard Pavers (your choice) Building area large concrete paver 600sf +/- Belgard Pavers (owners' choice) Wood plank pavers 500 sf in two areas Belgard Pavers (owners' choice) Stonework Natural dry creek area with borders and local stone dry creek Misc boulders and site stones Flagstone pathways with rock base and pea gravel or sand infill around stones Limestone path entry area Landscape New topsoil for all planting areas about 5000 sf Natural wood mulch for all areas 10 -shade trees 3" caliper 6- Understory trees 2" caliper 250 -#5-gallon shrubs and grasses 500- Perennials 1 QT and 1-gallon sizes HTG blue grass sports field sod Trash disposal from our work Irrigation Complete rework of irrigation from existing valves outside the area to feed all beds within the work limits. Surfacing Supply and install approx. 2000sqft of PIP (Poured in Place) rubber safety surfacing. Supply and install Certified Playground Mulch in areas I, J, K O, P, & Q
Award
Playgrounds / Parks / Athletic Fields
$349,368.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 22, 2024
March 25, 2024
5600 Oakland Ave, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: Feb 21 2024
Saint Louis, MO
Bid Date: Feb 29 2024
Saint Louis, MO
Bid Date: Feb 28 2024
Saint Louis, MO
Bid Date: Feb 28 2024
Saint Louis, MO
Bid Date: Feb 13 2024
Saint Louis, MO
Bid Date: Feb 28 2024
Saint Louis, MO
Bid Date: Feb 19 2024
Saint Louis, MO
Bid Date: Mar 21 2024
Saint Louis, MO
Bid Date: Feb 22 2024
Saint Louis, MO
Bid Date: Feb 21 2024
Saint Louis, MO
Bid Date: Feb 16 2024
Saint Louis, MO
Bid Date: Feb 21 2024
Saint Louis, MO
Bid Date: Mar 14 2024
Saint Louis, MO
Bid Date: Feb 23 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.