BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a mixed-use development in Saint Louis, Missouri. Completed plans call for site work for a educational facility; and playground / park / athletic field.

Playground Expansion at Forest Park Campus The College has the proposed minority goals MBE 15% and WBE 12%. Also proposed for Contractors to participate in a registered Apprenticeship Program approved through the United States Department of Labor. Individuals with special needs as addressed by the ADA may contact: 314- 984-7673 Questions Regarding the Scope of Work Should Be Directed to Jeff Blankenship at Jblankenship32 @stlcc.edu Question Deadline 02/13/2024 All grading necessary to install proposed new surfaces at 2% or less slope. All spoils left on site and graded out. Concrete flat work 3000sf colored concrete at Gathering area/garden area 3100 sf of sidewalks and concrete slab for shed. 440'+/- concrete curbs for synthetic turf areas and PIP Hardscape areas Nature art 600 sf +/- Belgard Pavers (your choice) Building area large concrete paver 600sf +/- Belgard Pavers (owners' choice) Wood plank pavers 500 sf in two areas Belgard Pavers (owners' choice) Stonework Natural dry creek area with borders and local stone dry creek Misc boulders and site stones Flagstone pathways with rock base and pea gravel or sand infill around stones Limestone path entry area Landscape New topsoil for all planting areas about 5000 sf Natural wood mulch for all areas 10 -shade trees 3" caliper 6- Understory trees 2" caliper 250 -#5-gallon shrubs and grasses 500- Perennials 1 QT and 1-gallon sizes HTG blue grass sports field sod Trash disposal from our work Irrigation Complete rework of irrigation from existing valves outside the area to feed all beds within the work limits. Surfacing Supply and install approx. 2000sqft of PIP (Poured in Place) rubber safety surfacing. Supply and install Certified Playground Mulch in areas I, J, K O, P, & Q

Award

Playgrounds / Parks / Athletic Fields

$349,368.00

Public - City

Site Work

3

8

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
52
Bidding Soon
797
All Active Projects
296
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

March 25, 2024

img_map_placeholder

5600 Oakland Ave, Saint Louis, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.