Site work and renovation of a civil project in Decatur, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The proposed project herein specified and described includes the following work: The Chemical Feed Upgrades project includes improvements to the following chemical feed systems at the South WTP: lime, chlorine gas, chlorine dioxide, cationic polymer, powdered activated carbon slurry, sodium bisulfite, polyphosphate, sodium hydroxide, and fluoride. For lime the base bid includes replacing existing equipment with four new high density hydrated lime feed systems with control panels. Alternate bid includes replacing existing equipment with four new pebble lime slaker feed system with control panels. Existing bulk storage liquid gas feed system will be replaced with a new bulk storage vacuum gas feed system. All chlorine gas PVC piping will be replaced with new PE piping. Adding a new chlorine dioxide generator to match the existing one to remain for one duty / one stand-by operation. Replacement of existing roto-dips system with three new peristaltic tube pumps for feeding powdered activated carbon. Replacement of existing metering pumps and piping for polyphosphate, sodium hydroxide, sodium bisulfite, fluoride, and cationic polymer. The Bulk Water Upgrades project includes structural, electrical, plumbing, mechanical, exterior concrete and control upgrades to the existing bulk water dispensing station. A separate date for substantial completion of the Bulk Water Upgrades has been specified. No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any Bidder orally. Every request for such interpretation should be in writing emailed to capitalprojects@decaturil.gov and to be given consideration must be received at least five (5) days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instruction will be in the form of written addenda to the Contract Documents which, if issued, the addenda will be posted on Decatur Blue Prints website at www.Decaturblue.com and notification will be e-mailed to all project plan holders, not later than three (3) calendar days prior to the date fixed for the opening of bids. Failure of any Bidder to receive any such addendum or interpretation shall not relieve such Bidder from any obligation under their bid as submitted. All addenda so issued shall become part of the Contract Documents. It shall be the responsibility of each Prospective Bidder to verify that each addendum has been received applicable to the project. The Contractor Shall at All Times During the Term of This Contract Pay the Applicable Prevailing Wage for Macon County for the Month During Which the Work is Performed, as Determined by the Illinois Department of Labor. Before the Contractor and Any Subcontractor Commences Work, the Contractor and Any Subcontractor Shall Have in Place a Written Substance Abuse Prevention Program for the Prevention of Substance Abuse Among Its Employees Which Meets or Exceeds the Requirements in P. A. 95-0635 or Shall Have a Collective Bargaining Agreement in Effect Dealing with the Subject Matter of P. A. 95-0635. Following Minority Participation Goals for Public Works Contracts Are in Effect for This Contract: (1) Ten (10) Percent (%) of the Total Dollar Amount of the Contract Should Be Performed by Minority Business Enterprises if Subcontracting Opportunities Are Available and/or Ten (10) Percent (%) of the Total Dollar Amount of the Contract Should Be for the Purchase of Goods, Material and Equipment to Minority Business Enterprises. The Council of the City of Decatur, Illinois, Reserves the Right to Accept, Renegotiate or Reject Any or All Proposals and to Waive Any Variance from the Requirements of the Instructions for Bidders. At the Discretion of the Council, Required Items May Be Submitted After the Bid Opening if There is Sufficient Compliance with Instructions at the Time of the Bid Opening to Permit the City to Determine the Price Bid.
Award
Water / Sewer
$5,378,271.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2024
May 20, 2024
Multiple Locations, Decatur, IL
Related To This Project
Decatur, IL
Bid Date: Feb 20 2024
Decatur, IL
Bid Date: Mar 06 2024
Decatur, IL
Bid Date: Mar 08 2024
Decatur, IL
Bid Date: Mar 20 2024
Decatur, IL
Bid Date: Apr 18 2024
Decatur, IL
Bid Date: Mar 11 2024
Decatur, IL
Bid Date: Apr 04 2024
Decatur, IL
Bid Date: Mar 04 2024
Decatur, IL
--
Decatur, IL
--
Decatur, IL
Bid Date: Feb 20 2024
Decatur, IL
--
Decatur, IL
Bid Date: Feb 20 2024
Decatur, IL
Bid Date: Jan 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.