Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition and site work for a military facility in Richmond, Virginia. Completed plans call for the demolition of a military facility; and for site work for a military facility.
Defense Supply Center Richmond(DSCR) Building 59E Implant Office Demolition This is a solicitation for construction prepared in accordance with the format in FAR Part 36, as supplemented with additional information included in this notice. The solicitation number SP4703-24-Q-0021 is issued as a request for quote (RFQ). The resulting contract will be a firm-fixed price award with an expected Period of Performance of 90 days after issuance of the Notice to Proceed (NTP). This acquisition is set-aside for 100% small businesses. The North American Industry Classification System (NAICS) Code is 238910 (Site Preparation Contractors). The small business size standard is $19M. Department of Labor Wage Determination based on location of the service provided (Chesterfield County, VA). Partial proposals will not be accepted. For an offer to be considered for award, the contractor must be within a commutable driving distance to the DSCR facility. A 120-mile radius from DSCR is considered the commutable radius. SPECIFIC REQUIREMENTS -The contractor shall demolish the entire 59E implant office. -Remove all electrical wiring and conduit back to the panels. -Remove all data, cable etc. back to the switch. Will need to coordinate with J6 to access COMM closet. Provide 5 business days' notice to access the comm closet. Remove the cable tray to the highest point. -Remove all flooring down to bare concrete. -Fill up to 200LF of cracks in the concrete floor. Grind out the cracks 1/4 " deep and wide. Clean and fill with an approved concrete crack filler per manufacturers recommendations. Prior to filling cracks an inspection is required. Provide 2 business days' notice for this inspection. -Remove the expansion joint in the floor completely. Fill the expansion joint with an approved expansion joint sealant per manufacturers recommendations. Prior to filling the expansion joint an inspection is required. Provide 2 business days' notice for this inspection. -On the exterior of this implant (but inside the warehouse) there are water lines that went to a hot water heater. The HW heater has been removed but the copper water lines remain. Cap off the old water lines that went to the water heater as high as possible along the North wall. -Remove and cap off the fire sprinkler system. Remove all fire alarm devices. Remove the vertical pipe to the highest level to meet the horizontal pipe. -Demo the concrete around all drains so a plug/cap can be installed on all the drain lines to seal off gases. Place concrete over the plugged/capped a minimum of 4" thick. Bagged concrete may be used. Prior to placing concrete an inspection is required. Provide 2 business days' notice for this inspection. -Remove and dispose of all materials, furniture and any other items left in this office. -Remove all equipment mounted to the wall including any associated conduit. Patch all holes left by removing these items. -The concrete floor in the footprint of the implant office needs to match the surrounding area in smoothness. Polish the footprint to a minimum image clarity of level 1 (flat). All glue, adhesives etc. need to be removed. The floor needs to be free of protrusions. - Prime/paint the floor to match the surroundings area using a minimum of two coats. Take a sample of the surrounding floor paint to match. Use a paint with low VOC and that allows vapors to pass through. - Move all lockers or other items on the outside of the office that may be in the way of demolition. - Remove and save the access card reader at the main doors. Provide to PM. - Remove and save all the fire alarm notification appliances. Provide to PM. -Reinstall one of the existing notification appliances on the east wall of the bay, approximately 25 ft. from the north wall of the bay. The appliance should be adjusted to the 110-candela setting. Install and test per NFPA. -All inspections for this project must take place on Tuesdays, Wednesdays, or Thursdays regardless of when notification is provided. -A dumpster can be placed very close to this implant outside the warehouse. -Provide a portable toilet. -Any other items not listed in this SOW shall be considered part of this demolition project. -The specific location of 59E is shown in red on the map at the end of this document. The height of the office is about 12'. The height of the warehouse roof is approximately 35'. If the contractor would like to look at the top of the office, they need to provide their own correctly sized ladder. No one will be allowed to walk on the office top for pre-bid investigation. Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions includes in this notice. Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS. The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote. All inquiries must be submitted no later than 7 business days prior to closing date. Acceptable method of quote submission is Email to Robert.Moragues@dla.mil. Questions are due on February 29, 2024, end of day. Submit questions via email to Robert.Moragues@dla.mil. Quotes are due on March 02, 2024, end of day. A site visit will be held at 1030 on February 22, 2024. A map which details the location of the site visit can be found on p.42 of the Statement of Work(SOW). Visitors must contact the Project Manager/Sponsor, Mike OConnor (via email only at Michael.OConnor@dla.mil) 72 hours prior to the site visit and confirm plan to attend. Access to Defense Supply Center Richmond is dictated by the language at the following location: https://www.dla.mil/Aviation/Installation/Visitors-and-ID-Office/ The points of contact (POC) for this requirement is Robert "Lee" Moragues (Robert.Moragues@dla.mil). Reference Attachment 1 - Statement of Work (SOW) for additional work scope, details, and DSCR map. Period of Performance:90 days from NTP **********************************Submission Requirements***************************************************** Instructions: Instructions contained herein are to serve as a guide in preparation of offers for this solicitation and are not intended to be all inclusive. These instructions generally describe the type and extent of information that should be provided in the offer and emphasize several areas that are generally considered significant. The offeror is expected to completely examine and analyze all aspects of the technical areas to be addressed and to include information in its offer that will enable the evaluators to determine the offerors' understanding of the requirements. Offers submitted shall be contained in two separate volumes as follows: Volume I - Technical Submission: The Technical Submission should consist of two elements: (1) A description of the vendors' understanding of the work to be performed as described in the Statement of Work. The description should demonstrate an understanding of the requirement and include a plan for satisfying the Government's minimum needs. The description should outline the actual work as specifically as possible. (2) Past Performance: The vendor shall document past performance and experience working with projects similar to the one described in the SOW. Documentation shall include relevant contract numbers, a brief description of the scope and magnitude of the work, information pertaining to when the work was completed, and a customer POC with contact information. Past performance and experience should demonstrate relevancy to the solicited projects, and document customer satisfaction and quality level achieved on prior projects. Total Page Limit for Volume I: Five (5) pages. Volume II - Pricing: By way of a fully executed/signed (including Section B) SF 1442, a firm fixed price quotation shall be provided for this requirement. Additional pricing information may be requested and/or provided separately as necessary. The Contractor is responsible for providing adequate documentation to enable a thorough evaluation of the offer and may choose to supplement the lump sum pricing stipulated on the SF 1442 with a formal quote and/or price breakdown on company letterhead, if desired. *****************************************Evaluation Criteria******************************************************** The offer will be evaluated on the basis of the following criteria: Factor 1 - Technical Acceptability In evaluation of this factor, offers will be evaluated to ensure: 1. The Vendor possesses an adequate understanding of the work as well as a process for ensuring quality and timeliness. 2. The Government has an acceptable level of confidence that the vendor can adequately perform the work described in the SOW. Based on the Government's evaluation of the respective vendor's technical submission, each vendor shall be assigned an overall Technical Rating in accordance with the definitions below: Technically Acceptable: Offer meets the requirements of the solicitation and based on the offeror's performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror's performance record is unknown. Technically Unacceptable: Offer does not meet the requirements of the solicitation and/or based on the offeror's performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort. Factor 2- Price Proposed price will be evaluated to determine reasonableness and completeness. The total firm-fixed price will be evaluated. ***************************************Standard DSCR Visitor Information************************ A new system was implemented on 3 January 2023 to screen visitors and contractors for installation access at DSCR. The new system is designed to increase efficiencies, enhance the protection of personal information during the vetting process and eliminate the use of hard copy DLA Form 1815s. The new screening system will require visitors and contractors to pre-enroll in DBIDS (Defense Biometric Identification System). To begin the process, visitors and contractors will complete registration through the preenrollment website: https://dbids-global-enroll.dmdc.mil. Upon entry of their information, visiting personnel will be provided an electronic form to download, which will have an individualized barcode and alpha numeric code. The codes will be electronically sent to the visiting person's sponsor. Once in receipt of the barcode, the sponsor will email Security and Emergency Services and provide the barcode and sponsorship information. Once the visitor/contractor is vetted and approved for installation access, Security & Emergency Services will notify the sponsor that the visitor/contractor can go to the DSCR Visitor Center to obtain his/her pass. At the Visitor Center, the visitor provides the barcode and code provided earlier in the process and completes the credentialing process. Visitors should arrive at the visitor center at least 45 minutes prior to their meeting time to receive visitor badges.
Post-Bid
Military
$500,000.00
Public - Federal
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 8, 2024
April 9, 2024
8000 Jefferson Davis Hwy, Richmond, VA
Related To This Project
Richmond, VA
Bid Date: Feb 26 2024
Richmond, VA
--
Richmond, VA
--
Richmond, VA
--
Richmond, VA
Bid Date: Mar 08 2024
Richmond, VA
--
Richmond, VA
--
Richmond, VA
Bid Date: Oct 07 2021
Richmond, VA
Bid Date: Jun 27 2024
Richmond, VA
Bid Date: Feb 27 2024
Richmond, VA
--
Richmond, VA
--
Richmond, VA
--
Richmond, VA
--
Richmond, VA
Bid Date: Oct 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.