Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2024 at 8:00 PM

Updated May 8, 2024

Site work and paving for a mixed-use development in Sturtevant, Wisconsin. Completed plans call for site work for a detention facility; for paving for a sidewalk / parking lot; and sidewalk / parking lot.

In general, the work consists of: the replacement of brick pavers with concrete sidewalk, the replacement of 36 damaged concrete flatwork with new concrete, and the placement of new concrete flatwork within non-paved areas. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014

Award

Jails / Prisons

$146,872.00

Public - State/Provincial

Paving, Site Work

11

13

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
569
Active Projects
225
Bidding Soon
3,904
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

April 8, 2024

Project location map

2019 Wisconsin St, Sturtevant, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed