BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2024 at 8:00 PM

Updated October 3, 2025

Site work and renovation of a civil project in Henryetta, Oklahoma. Completed plans call civil work for a water / sewer project.

Section A - Back-Up Power Improvements 1. Furnish & Install Generator and Auto Transfer Switch at Water Plant This item will be paid for on a lump sum bid. This item will be the furnishing and installation of a generator and an automatic transfer switch to the proposed site as described in the project Plans and Specifications. This item shall comply with all applicable codes and regulations and follow manufacturer installation instructions. This item shall include all site preparation, concrete work, electrical work, fuel storage & system work, exhaust system work, generator installation, startup and commissioning, tools, fittings, labor, equipment, and any other incidental items needed to install the generator in accordance with the Plans and Technical Provisions. This item shall also include testing for proper operation. 2. Furnish & Install Generator and Auto Transfer Switch at Carson Booster Pump Station This item will be paid for on a lump sum bid. This item will be the furnishing and installation of a generator and an automatic transfer switch to the proposed site as described in the project Plans and Specifications. This item shall comply with all applicable codes and regulations and follow manufacturer installation instructions. This item shall include all site preparation, concrete work, electrical work, fuel storage & system work, exhaust system work, generator installation, startup and commissioning, tools, fittings, labor, equipment, and any other incidental items needed to install the generator in accordance with the Plans and Technical Provisions. This item shall also include testing for proper operation. Section B1 - Neptune Water Meters 3. 5/8" Mach 10 R900 Meter This item shall be the furnishing of a meter in accordance with the Specifications. Meters must conform to AWWA C-715. Meters shall be paid on a per each unit bid price. Installation shall be paid under Section B2. 4. 1" Mach 10 R900 Meter This item shall be the furnishing of a meter in accordance with the Specifications. Meters must conform to AWWA C-715. Meters shall be paid on a per each unit bid price. Installation shall be paid under Section B2. 5. 2" Mach 10 R900 Meter This item shall be the furnishing of a meter in accordance with the Specifications. Meters must conform to AWWA C-715. Meters shall be paid on a per each unit bid price. Installation shall be paid under Section B2. Bid Result Section A Sunrise Construction-$284,900 SECTION B1 Core & Main LP-$203,160 BID SECTION B2 Core & Main LP-$35,770 SECTION C1 Utility Technology-$192,265 SECTION C2 Utility Technology-$45,950 SECTION D1 Patriot Construction-$327,200 SECTION D2 Patriot Construction-$364,700 SECTION E Kinard Painting & Sandblasting-$465,621

Award

Water / Sewer

$238,215.00

Public - County

Renovation, Site Work

10

13

4

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
94
Bidding Soon
1,035
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

March 11, 2024

Project location map

Multiple Locations, Henryetta, OK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.