EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 27, 2024 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in Henryetta, Oklahoma. Completed plans call civil work for a water / sewer project.

Section A - Back-Up Power Improvements 1. Furnish & Install Generator and Auto Transfer Switch at Water Plant This item will be paid for on a lump sum bid. This item will be the furnishing and installation of a generator and an automatic transfer switch to the proposed site as described in the project Plans and Specifications. This item shall comply with all applicable codes and regulations and follow manufacturer installation instructions. This item shall include all site preparation, concrete work, electrical work, fuel storage & system work, exhaust system work, generator installation, startup and commissioning, tools, fittings, labor, equipment, and any other incidental items needed to install the generator in accordance with the Plans and Technical Provisions. This item shall also include testing for proper operation. 2. Furnish & Install Generator and Auto Transfer Switch at Carson Booster Pump Station This item will be paid for on a lump sum bid. This item will be the furnishing and installation of a generator and an automatic transfer switch to the proposed site as described in the project Plans and Specifications. This item shall comply with all applicable codes and regulations and follow manufacturer installation instructions. This item shall include all site preparation, concrete work, electrical work, fuel storage & system work, exhaust system work, generator installation, startup and commissioning, tools, fittings, labor, equipment, and any other incidental items needed to install the generator in accordance with the Plans and Technical Provisions. This item shall also include testing for proper operation. Section B1 - Neptune Water Meters 3. 5/8" Mach 10 R900 Meter This item shall be the furnishing of a meter in accordance with the Specifications. Meters must conform to AWWA C-715. Meters shall be paid on a per each unit bid price. Installation shall be paid under Section B2. 4. 1" Mach 10 R900 Meter This item shall be the furnishing of a meter in accordance with the Specifications. Meters must conform to AWWA C-715. Meters shall be paid on a per each unit bid price. Installation shall be paid under Section B2. 5. 2" Mach 10 R900 Meter This item shall be the furnishing of a meter in accordance with the Specifications. Meters must conform to AWWA C-715. Meters shall be paid on a per each unit bid price. Installation shall be paid under Section B2. Bid Result Section A Sunrise Construction-$284,900 SECTION B1 Core & Main LP-$203,160 BID SECTION B2 Core & Main LP-$35,770 SECTION C1 Utility Technology-$192,265 SECTION C2 Utility Technology-$45,950 SECTION D1 Patriot Construction-$327,200 SECTION D2 Patriot Construction-$364,700 SECTION E Kinard Painting & Sandblasting-$465,621

Award

Water / Sewer

$238,215.00

Public - County

Renovation, Site Work

10

13

4

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
49
Bidding Soon
644
All Active Projects
312
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

March 11, 2024

img_map_placeholder

Multiple Locations, Henryetta, OK


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Water System Improvements - Water Infrastructure Updates

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.