BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Kansas City, Missouri. Completed plans call for the renovation of a educational facility.

Introduction. Kansas City Public Schools (KCPS) serves more than 14,000 students in grades pre-kindergarten through 12. KCPS consists of six (6) high schools, three (3) middle schools, twenty-three (23) elementary schools, (nine (9) being signature schools), two (2) early learning community schools, and one (1) Vocational/Technical school. KCPS encompasses 76 square miles and employs nearly 2,500 professionals. Anticipated Completion Schedule: NO LATER THAN JULY 15TH, 2024 KCPS provides comprehensive educational services for students in Pre-Kindergarten through grade 12. KCPS utilizes a variety of delivery mechanisms within its learning community to provide educational programs, offerings, and services. The delivery mechanisms utilized are based upon the unique academic and behavioral needs of each student. The annual goal for MBE should equal 9.8 percent of the applicable KCPS spend. The annual goal for WBE should equal 8.5 percent of the applicable KCPS spend KCPS received full accreditation by the Missouri State Board of Education January 11, 2022. KCPS continues to adopt an aggressive approach to implementing the Common Core Standards while pursuing an increased use of personal computing and technology. IFB Questions Due: February 7, 2024 at 4:00 PM CDT Answers/Addendum Due: February 9, 2024 at 4:00 PM CDT. Questions All questions regarding this IFB shall be made electronically via e-mail and directed to Connie Fuimaono at bidquestions@kcpublicschools.org. Kansas City Public Schools (KCPS) will engage the services of a Mechanical Contractor to provide the following scope of services as indicated in documents. AC-7 Group 1 - Garfield, Whittier, and James Elementary Schools: Provide packaged rooftop units and ductwork to cool Garfield and Whittier gymnasiums. Provide a horizontal split system and ductwork to cool James gymnasium. Provide ductless mini-split systems to cool miscellaneous unconditioned areas including corridors, Whittier cafeteria, and James kitchen. Provide power, structural, controls, and piping for new installations. AC-7 Group 2 - Wheatley and Melcher Elementary Schools: Provide packaged rooftop units and ductwork to cool gymnasiums. Provide ductless mini-split systems to cool miscellaneous unconditioned areas including corridors, Wheatley Building Manager Office, and Melcher View/Carrel area & Teacher Library. Provide power, structural, controls, and piping for new installations. AC-7 Group 3 - Southeast High School and Border Star Montessori: Provide horizontal split systems and ductwork to cool Border Star gymnasium. Provide ductless mini-split systems to cool miscellaneous unconditioned areas including corridors, Border Star kitchen & faculty dining, and Southeast High School kitchen & cafeteria. Provide power, structural, controls, and piping for new installations. Bid Bond Requirements. A Bid Bond by an acceptable surety of 5% of the total bid is required with the submission of this IFB under Tab 6. Contractors are required to review the Project Manual for all the bond requirements of this bid. The Contractor shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder in accordance with RSMo 107.170 for any bid totaling more than $25,000. Bonds may be secured through the Contractor's usual sources. The cost of bonds shall be included in the IFB. A Bid Bond of 5% of the total bid amount is required with the submission of the IFB, Tab 5. The successful Offeror may be required to submit a Performance Bond and Payment Bond in the amount of one hundred percent (100%) of the contract amount within ten (10) business days after the contract award. Rejection of Proposals. KCPS reserves the right to refuse for any reason deemed to be in its best interest any and all bids submitted in response to this IFB. Vendors may or may not receive notification from KCPS if their proposal is rejected.

Bid Results

Educational

$1,690,000.00

Public - City

Renovation

131

8

91

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
29
Bidding Soon
715
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Kansas City, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.