BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Laguna Hills, California. Contact the soliciting agency for additional information.

Written Question Deadline: February 26, 2024 at 5:00 P.m. Questions Answered/addenda Issued: February 29, 2024 by 5:00 P.m. Interviews to Be Held on: Tbd, if Requested Proposed Effective Date of Professional Services Agreement: March 26, 2024 The City is Seeking a Qualified Professional Design Consultant to Provide Park Design Services for the Rehabilitation of El Conejo Park and Mackenzie Park. The City Has Tentatively Budgeted $815,000 for the Rehabilitation of These Parks. At El Conejo Park, the Primary Focus of the City is to Remove an Existing Unused Zipline Structure, Install a Small Age 2-5 Playground, Keep the Existing Age 5-12 Playground Structure and Replace Worn Components, and Replace All Rubber Surfacing at the Park. The City Council Also Expressed an Interest in Rehabilitating Other Existing Improvements Based Upon Available Budget and Interests of the Community, Which Will Necessitate Evaluating All of the Other Existing Improvements at the Park. At Mackenzie Park, the Primary Focus of the City is to Remove the Existing Large Age 5- 12 Playground and Install Two Smaller Playground Units - One for Age 2-5 Children and One for Age 5-12 Children - and Replace All Existing Rubber Surfacing. Alternatively, Dependent on Cost and Community Feedback, the Existing Large Age 5-12 Playground Could Be Replaced With Smaller Individual Playground Structures for Ages 2-12 Children. The City Council Also Expressed an Interest in Rehabilitating Other Existing Improvements Based Upon Available Budget and Interests of the Community, Which Will Necessitate Evaluating All of the Other Existing Improvements at the Park. It Should Be Noted That the Tennis Courts Were Recently Resurfaced by the City. The City Does Not Have a Parks Master Plan With Park Priorities From Which to Provide a Framework for Decision Makers in Prioritizing and Planning These Park Rehabilitation Projects. Therefore, the Project Includes Community Outreach Efforts. The Desired Scope of Services Consists of the Following Components: 1. Inventory Existing Park Improvements 2. Community Outreach and Community Needs Assessment 3. Preliminary Design 4. Final Design Plans, Construction Documents, and Specifications 5. Optional: Construction Management and Contract Administration Location Maps for the Parks Are on the Next Page. Additional Information Concerning the Scope of Services Can Be Found in Section The City is Seeking a Qualified Professional Design Consultant to Provide Park Design Services for the Rehabilitation of El Conejo Park and Mackenzie Park. The City Has Tentatively Budgeted $815,000 for the Rehabilitation of These Parks. At El Conejo Park, the Primary Focus of the City is to Remove an Existing Unused Zipline Structure, Install a Small Age 2-5 Playground, Keep the Existing Age 5-12 Playground Structure and Replace Worn Components, and Replace All Rubber Surfacing at the Park. The City Council Also Expressed an Interest in Rehabilitating Other Existing Improvements Based Upon Available Budget and Interests of the Community, Which Will Necessitate Evaluating All of the Other Existing Improvements at the Park. At Mackenzie Park, the Primary Focus of the City is to Remove the Existing Large Age 5-12 Playground and Install Two Smaller Playground Units - One for Age 2-5 Children and One for Age 5-12 Children - and Replace All Existing Rubber Surfacing. Alternatively, Dependent on Cost and Community Feedback, the Existing Large Age 5-12 Playground Could Be Replaced With Smaller Individual Playground Structures for Ages 2-12 Children. The City Council Also Expressed an Interest in Rehabilitating Other Existing Improvements Based Upon Available Budget and Interests of the Community, Which Will Necessitate Evaluating All of the Other Existing Improvements at the Park. It Should Be Noted That the Tennis Courts Were Recently Resurfaced by the City. Written Question Deadline: February 26, 2024 at 5:00 P.m. Questions Answered/addenda Issued: February 29, 2024 by 5:00 P.m. Nterviews to Be Held on: Tbd, if Requested Proposed Effective Date of Professional Services Agreement: March 26, 2024 User is Responsible for Checking This Page for Any Addenda and/or Changes El Conejo Park is Located Adjacent to El Conejo Lane. Mackenzie Park is Located at the Corner of Mackenzie Street and Pike Road. Nterviews to Be Held on: Tbd, if Requested Proposed Effective Date of Professional Services Agreement: March 26, 2024 User is Responsible for Checking This Page for Any Addenda and/or Changes El Conejo Park is Located Adjacent to El Conejo Lane. Mackenzie Park is Located at the Corner of Mackenzie Street and Pike Road. The City is seeking a qualified professional design consultant to provide park design services for the rehabilitation of El Conejo Park and MacKenzie Park. The City has tentatively budgeted $815,000 for the rehabilitation of these parks. At El Conejo Park, the primary focus of the City is to remove an existing unused zipline structure, install a small age 2-5 playground, keep the existing age 5-12 playground structure and replace worn components, and replace all rubber surfacing at the park. The City Council also expressed an interest in rehabilitating other existing improvements based upon available budget and interests of the community, which will necessitate evaluating all of the other existing improvements at the park. At MacKenzie Park, the primary focus of the City is to remove the existing large age 5- 12 playground and install two smaller playground units - one for age 2-5 children and one for age 5-12 children - and replace all existing rubber surfacing. Alternatively, dependent on cost and community feedback, the existing large age 5-12 playground could be replaced with smaller individual playground structures for ages 2-12 children. The City Council also expressed an interest in rehabilitating other existing improvements based upon available budget and interests of the community, which will necessitate evaluating all of the other existing improvements at the park. It should be noted that the tennis courts were recently resurfaced by the City. The City does not have a Parks Master Plan with park priorities from which to provide a framework for decision makers in prioritizing and planning these park rehabilitation projects. Therefore, the project includes community outreach efforts. The desired Scope of Services consists of the following components: 1. Inventory Existing Park Improvements 2. Community Outreach and Community Needs Assessment 3. Preliminary Design 4. Final Design Plans, Construction Documents, and Specifications 5. Optional: Construction Management and Contract Administration Location maps for the parks are on the next page

Conceptual

Playgrounds / Parks / Athletic Fields

$815,000.00

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
114
Bidding Soon
2,442
All Active Projects
963
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

img_map_placeholder

Multiple Locations, Laguna Hills, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.