Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Laguna Hills, California. Contact the soliciting agency for additional information.
Written Question Deadline: February 26, 2024 at 5:00 P.m. Questions Answered/addenda Issued: February 29, 2024 by 5:00 P.m. Interviews to Be Held on: Tbd, if Requested Proposed Effective Date of Professional Services Agreement: March 26, 2024 The City is Seeking a Qualified Professional Design Consultant to Provide Park Design Services for the Rehabilitation of El Conejo Park and Mackenzie Park. The City Has Tentatively Budgeted $815,000 for the Rehabilitation of These Parks. At El Conejo Park, the Primary Focus of the City is to Remove an Existing Unused Zipline Structure, Install a Small Age 2-5 Playground, Keep the Existing Age 5-12 Playground Structure and Replace Worn Components, and Replace All Rubber Surfacing at the Park. The City Council Also Expressed an Interest in Rehabilitating Other Existing Improvements Based Upon Available Budget and Interests of the Community, Which Will Necessitate Evaluating All of the Other Existing Improvements at the Park. At Mackenzie Park, the Primary Focus of the City is to Remove the Existing Large Age 5- 12 Playground and Install Two Smaller Playground Units - One for Age 2-5 Children and One for Age 5-12 Children - and Replace All Existing Rubber Surfacing. Alternatively, Dependent on Cost and Community Feedback, the Existing Large Age 5-12 Playground Could Be Replaced With Smaller Individual Playground Structures for Ages 2-12 Children. The City Council Also Expressed an Interest in Rehabilitating Other Existing Improvements Based Upon Available Budget and Interests of the Community, Which Will Necessitate Evaluating All of the Other Existing Improvements at the Park. It Should Be Noted That the Tennis Courts Were Recently Resurfaced by the City. The City Does Not Have a Parks Master Plan With Park Priorities From Which to Provide a Framework for Decision Makers in Prioritizing and Planning These Park Rehabilitation Projects. Therefore, the Project Includes Community Outreach Efforts. The Desired Scope of Services Consists of the Following Components: 1. Inventory Existing Park Improvements 2. Community Outreach and Community Needs Assessment 3. Preliminary Design 4. Final Design Plans, Construction Documents, and Specifications 5. Optional: Construction Management and Contract Administration Location Maps for the Parks Are on the Next Page. Additional Information Concerning the Scope of Services Can Be Found in Section The City is Seeking a Qualified Professional Design Consultant to Provide Park Design Services for the Rehabilitation of El Conejo Park and Mackenzie Park. The City Has Tentatively Budgeted $815,000 for the Rehabilitation of These Parks. At El Conejo Park, the Primary Focus of the City is to Remove an Existing Unused Zipline Structure, Install a Small Age 2-5 Playground, Keep the Existing Age 5-12 Playground Structure and Replace Worn Components, and Replace All Rubber Surfacing at the Park. The City Council Also Expressed an Interest in Rehabilitating Other Existing Improvements Based Upon Available Budget and Interests of the Community, Which Will Necessitate Evaluating All of the Other Existing Improvements at the Park. At Mackenzie Park, the Primary Focus of the City is to Remove the Existing Large Age 5-12 Playground and Install Two Smaller Playground Units - One for Age 2-5 Children and One for Age 5-12 Children - and Replace All Existing Rubber Surfacing. Alternatively, Dependent on Cost and Community Feedback, the Existing Large Age 5-12 Playground Could Be Replaced With Smaller Individual Playground Structures for Ages 2-12 Children. The City Council Also Expressed an Interest in Rehabilitating Other Existing Improvements Based Upon Available Budget and Interests of the Community, Which Will Necessitate Evaluating All of the Other Existing Improvements at the Park. It Should Be Noted That the Tennis Courts Were Recently Resurfaced by the City. Written Question Deadline: February 26, 2024 at 5:00 P.m. Questions Answered/addenda Issued: February 29, 2024 by 5:00 P.m. Nterviews to Be Held on: Tbd, if Requested Proposed Effective Date of Professional Services Agreement: March 26, 2024 User is Responsible for Checking This Page for Any Addenda and/or Changes El Conejo Park is Located Adjacent to El Conejo Lane. Mackenzie Park is Located at the Corner of Mackenzie Street and Pike Road. Nterviews to Be Held on: Tbd, if Requested Proposed Effective Date of Professional Services Agreement: March 26, 2024 User is Responsible for Checking This Page for Any Addenda and/or Changes El Conejo Park is Located Adjacent to El Conejo Lane. Mackenzie Park is Located at the Corner of Mackenzie Street and Pike Road. The City is seeking a qualified professional design consultant to provide park design services for the rehabilitation of El Conejo Park and MacKenzie Park. The City has tentatively budgeted $815,000 for the rehabilitation of these parks. At El Conejo Park, the primary focus of the City is to remove an existing unused zipline structure, install a small age 2-5 playground, keep the existing age 5-12 playground structure and replace worn components, and replace all rubber surfacing at the park. The City Council also expressed an interest in rehabilitating other existing improvements based upon available budget and interests of the community, which will necessitate evaluating all of the other existing improvements at the park. At MacKenzie Park, the primary focus of the City is to remove the existing large age 5- 12 playground and install two smaller playground units - one for age 2-5 children and one for age 5-12 children - and replace all existing rubber surfacing. Alternatively, dependent on cost and community feedback, the existing large age 5-12 playground could be replaced with smaller individual playground structures for ages 2-12 children. The City Council also expressed an interest in rehabilitating other existing improvements based upon available budget and interests of the community, which will necessitate evaluating all of the other existing improvements at the park. It should be noted that the tennis courts were recently resurfaced by the City. The City does not have a Parks Master Plan with park priorities from which to provide a framework for decision makers in prioritizing and planning these park rehabilitation projects. Therefore, the project includes community outreach efforts. The desired Scope of Services consists of the following components: 1. Inventory Existing Park Improvements 2. Community Outreach and Community Needs Assessment 3. Preliminary Design 4. Final Design Plans, Construction Documents, and Specifications 5. Optional: Construction Management and Contract Administration Location maps for the parks are on the next page
Conceptual
Playgrounds / Parks / Athletic Fields
$815,000.00
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2025
Multiple Locations, Laguna Hills, CA
Related To This Project
Laguna Hills, CA
Bid Date: Apr 24 2024
Laguna Hills, CA
Bid Date: Apr 22 2024
Laguna Hills, CA
Bid Date: May 09 2024
Laguna Hills, CA
Bid Date: May 30 2024
Laguna Hills, CA
Bid Date: Jun 12 2024
Laguna Hills, CA
--
Laguna Hills, CA
Bid Date: Jun 20 2024
Laguna Hills, CA
Bid Date: Mar 11 2024
Laguna Hills, CA
Bid Date: Apr 02 2020
Laguna Hills, CA
Bid Date: Dec 31 2024
Laguna Hills, CA
Bid Date: Jan 17 2024
Laguna Hills, CA
Bid Date: Nov 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.