BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a playground / park / athletic field in Kirkwood, Missouri. Completed plans call for site work for a playground / park / athletic field; and for the demolition of a playground / park / athletic field.

As of June 11,2024, project was awarded toTubbs & Son Construction, awarded amount is $98,423.95. https://www.firstalert4.com/2024/06/04/kirkwood-demolish-vacant-athletic-fields-due-state-disrepair/ Kirkwood to demolish vacant athletic fields due to state of disrepair KIRKWOOD, Mo. (First Alert 4) - The Kirkwood Athletic Association fields off Marshall Road will soon be demolished after neglect, vandalism and a state of disrepair. The city of Kirkwood voted to approve demolition last month of the fields and structures. “Sad, disappointed, but not surprised,” said Eric Eickmeyer, the former president of Kirkwood Atheltic Association who ran the nonprofit. They had a series of tough years which prompted them to transfer the property over to the city of Kirkwood. “We didn’t have money to put gas in the mowers,” Eickmeyer said. __________________________________ This project comprises of the complete removal of all structures, fencing, utility abandonment, pavement removal from within the current fencing boundaries. All contents of buildings and grounds become the responsibility of the contractor for removal from the property. All structures and materials are to be razed and removed from the site. The semi-trailer parked outside the confines of the fence is also to be removed from the site. The paved parking area outside the fencing is not included and shall remain. Preserve or remove designated trees as identified by city staff. Trees designated for removal will be marked with a pink 'X'. The ballfield lighting tower, poles and light fixtures associated with lighting the fields are to remain intact on site. All fencing except that which confines the tower is to be removed as late into the project as possible to provide continued site security. The structures have been inspected by an abatement contractor for asbestos/lead by the City. That analysis will be furnished to the contractor. Upon identification of materials requiring abatement, those materials will be removed according to state, county and local regulations prior to razing the structures. Required Chain of Custody of such materials is required and recorded/filed with the governing authority. Disposal will also adhere to regulations as required, and be transported/deposited at a facility with Chain of Custody according to regulations. Question Deadline 04/17/2024 at 5:00 PM CT The City of Kirkwood (hereafter noted as "the City") is requesting sealed proposals for Kirkwood Athletic Association Demolition and Site Clearance. Qualified Firms (hereafter noted as "Firm") are invited to submit sealed proposals to provide Kirkwood Athletic Association Demolition and Site Clearance for the City of Kirkwood in accordance with the specifications contained herein. All questions pertaining to this opportunity must be asked via Ionwave. No Faxed, Hand Delivered, Mailed, or Emailed Responses will be accepted. Any contact by Supplier in regards to this proposal with City personnel other than those defined herein may be considered grounds for dismissal of Supplier's proposal.

Award

Playgrounds / Parks / Athletic Fields

$98,424.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
99
Bidding Soon
1,386
All Active Projects
612
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 23, 2024

May 24, 2024

img_map_placeholder

2377 Marshall Rd, Kirkwood, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.