BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Weston, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

In general, the work shall include crack filling and seal coating approximately 8,300 feet of Lahr Avenue and 2,900 feet of Fust Lane. The Town may elect to award some but not all of the work. The approximate units of the major work items are as follows: Lahr Avenue 8,300 feet long Crack Filling on street Seal Coat on street surface of 21,000 square yards Fust Lane feet long Crack Filling on street 2,900 Seal Coat on street surface of 8,200 square yards No bids shall be considered unless. submitted on the official Proposal form. The Town of Weston reserves the right to reject any or all bids, to waive any informality in the bidding, and to award the Contract in the best interest of the Town. No bid shall be withdrawn for a period of 21 days after the actual time of opening the bids. No Bid Bond is required. A Performance Bond and a Payment Bond each in the amount of 100 percent (100%) of the total bid price, together with an executed Agreement in the form prescribed by the Town, will be required of the successful bidder. Copies of the Contract Documents may be obtained from the office of Marathon Technical Services LLC, located at 1699 Schofield Ave. STE 115, Schofield WI 54476 or by emailing Mark Thompson at mark@mtsllc.net. The work shall consist of crack filling with a sealant material meeting ASTM D6690, and bituminous seal coating with stone cover aggregate. The work shall be done in accordance with Sections 455, 460 and 475 of Standard Specifications. This work shall consist of furnishing all materials, equipment, and labor necessary for Crack Filling and the application of Bituminous Seal Coating as directed. The work, to be completed between June 1, 2024 and AUGUST 15, 2024, shall include crack filling and chip sealing on Lahr Avenue and Fust Lane. The Town may elect to award some or all of the work as bids and budgets allow. The quantities in the bid form are estimated and not guaranteed. The work on all streets may not be awarded based on bid totals and allotted budgets. All work shall conform to WDOT Standard Specifications for Highway and Structure Construction (Latest Edition Standard Specifications) and WDOT Special Provisions for Performance Based Maintenance (2021 Edition).

Award

Roads / Highways

$90,446.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
15
Bidding Soon
195
All Active Projects
82
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

June 1, 2024

img_map_placeholder

Multiple Locations, Weston, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.