BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2024 at 8:00 PM

Updated April 23, 2024

Site work and paving for a mixed-use development in Saint Louis, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of March 28, 2024, project was awarded to E. Meier Construction, in the amount of $457,971.40.** 2024 Concrete Curb and Full Depth Asphalt Drive Replacement Project - The Scope of Work includes breaking out and hauling away old materials, preparing base, forming, placement and finishing of concrete curbing, placing full depth and width of asphalt pavement, turf restoration/backfilling (as necessary to restore the original look), site cleanup, traffic control, and other incidental items. The St. Louis County Transportation Standard Drawing for Residential Street Design is to meet St. Louis County drawing C203.82, Type 2, for concrete curb and gutter with bituminous concrete surfacing. The Work is to be accomplished during the period June 3, 2024 to November 1, 2024; between the hours of 7:00 A.M. and 7:00 P.M. Question Deadline 02/14/2024 Bidders may request clarification or interpretation of the Bidding Documents by making a written request which shall reach the City at least seven (7) days prior to the date for receipt of Bids. Please contact Mr. James Swingle at jswingle@cityofcrestwood.org with questions.

Award

Roads / Highways

$457,971.00

Public - City

Paving, Site Work

3

5

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2024

June 3, 2024

Project location map

Multiple Locations, Saint Louis, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.