BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Milwaukee, Wisconsin. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Questions Due Date: Feb 22nd 2024, 4:00 PM CST Requests for further information or questions regarding this Request for Proposal should be addressed only to the Contact Person listed below. UNAUTHORIZED CONTACT REGARDING THIS REQUEST FOR PROPOSAL WITH ANY DISTRICT EMPLOYEE MAY RESULT IN DISQUALIFICATION. Any oral communication will be considered unofficial and non-binding. Proposers shall rely only on written addenda issued by the individual listed below. Millie Neidhardt Procurement Specialist Milwaukee Metropolitan Sewerage District 260 West Seeboth Street Milwaukee, WI 53204-1446 e-mail: eneidhardt@mmsd.com The purpose of the 43rd Street Ditch project is to reduce the risk of flooding for 13 structures within the floodplain along the 43rd Street Ditch, reduce roadway flooding from 43rd Street Ditch at the intersection of two major arterial roads: W. Lincoln Avenue and S. 43rd Street, and address failing assets (corrugated metal pipe culverts and concrete channel lining). In conjunction with Project W40009 - Jackson Park, this project will also provide flood storage to reduce flood risk downstream on the KK River where over 300 residential and commercial structures are located in the 1% annual probability floodplain. The District completed preliminary engineering for the recommended improvements at 43rd Street Ditch, and this work is detailed in the 43rd Street Ditch Preliminary Engineering Report (PER) - (HNTB, January 2024). The District is requesting professional services of a Consultant to perform final design for the 43rd Street Ditch Design project (W42003). The work includes refining the designs and producing construction plans and specifications for the flood storage basin, inline weir/diversion structure, open channels and culvert improvements as identified in the RFP. The project will include stakeholder and public feedback throughout the project. The District will lead the stakeholder and public outreach for this project, and the Consultant shall participate and provide materials to assist with the outreach.

Conceptual

Bridges / Tunnels

$900,000.00

Public - County

Paving, Site Work

3

10

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
65
Bidding Soon
1,534
All Active Projects
672
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

img_map_placeholder

S 43rd St, Milwaukee, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.