BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Jacksonville, Florida. Contact the soliciting agency for additional information.

The Jacksonville District Corps of Engineers is soliciting comments from the dredging community addressing the potential use of Project Labor Agreements (PLAs) for the below upcoming MATOC Contract: Project Name: South Atlantic Division Regional Small Business Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Maintenance Dredging Summary: U.S. Army Corps of Engineers (USACE), South Atlantic Division (SAD) is contemplating the issuance of a Small Business Regional Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Maintenance Dredging and Shore Protection Projects within the Boundaries of USACE, SAD. See http://www.usace.army.mil/Locations.aspx for boundaries of USACE, SAD. These contracts will be established primarily to serve the boundaries of the SAD area of responsibility. Secondarily, these contracts may be used to provide services outside of SAD in the event of emergency dredging requirements. The Small Business Regional Dredging MATOC will be for one base year and include four option years for a maximum total period of five years. The MATOC will have a maximum combined capacity of $400M. One pool of contractors will be awarded contracts, based on the small business size standard for NAICS Code 237990, Dredging and Surface Cleanup Activities. Task orders for work that has been historically set-aside for small business will be set-aside under the small business MATOC pool in accordance with FAR 16.505(b)(2)(i)(F). PLA is defined as a Pre-Hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Reference Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, and Federal Acquisition Regulation (FAR) 22.5. Also reference provision 52.222-33 Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreements. NOTE: Each Task Order may be evaluated on a project-by-project basis for possible application of a PLA. In consideration of the above factors and any others which may be deemed appropriate, the dredging community is invited to comment on the use of PLA's. The Government is requesting responses to the following questions: 1. Do you have knowledge that a PLA has been used in the local area on projects of this kind If so, please provide supporting documentation. Project Name and Location Detailed Project Description Initial Cost Estimate vs. Actual Final Cost Was the project completed on time Number of craft trades present on the project Were there any challenges experienced during the project 2. Are you aware and/or are there concerns by the prime contractors of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project If so, please elaborate and provide supporting documentation. Information may reference current apprenticeship statistics and workforce age demographics. 3. Are you aware of time sensitive issues/scheduling requirements where use of the PLA would affect the rate at which the referenced project would be completed If so, please elaborate and provide supporting documentation. 4. Are you aware of any cost impact where the use of PLA will affect the construction cost of the referenced project If so, please elaborate and provide supporting documentation. 5. Based on FAR 52.222-33 and alternates and 52.222-34 and alternates do you see any negative and/or positive impacts of submitting the PLA at one phase of the procurement process over another If so, please explain. 6. Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. 7. Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. 8. Identify any additional information with supporting documentation/statistics that you believe should be considered on the use of a PLA on the referenced project. 9. Identify any additional information with supporting documentation/statistics that you believe should be considered on the non-use of a PLA on the referenced project. 10. Is your firm a serious interested party in that you intend to submit a proposal for this procurement Will the use of a PLA impact your ability to bid If so, please explain Please provide your responses by no later than 3:00 PM Eastern Standard Time (EST), Friday, 9 February 2024. Submit your responses and any questions to Mr. Timothy Humphrey via email at Timothy.G.Humphrey@usace.army.mil and Mr. William J. Wallace at William.J.Wallace@usace.army.mil.

Final Planning

Water / Sewer

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
636
All Active Projects
271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

img_map_placeholder

Multiple Locations, Jacksonville, FL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.