Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Jacksonville, Florida. Contact the soliciting agency for additional information.
The Jacksonville District Corps of Engineers is soliciting comments from the dredging community addressing the potential use of Project Labor Agreements (PLAs) for the below upcoming MATOC Contract: Project Name: South Atlantic Division Regional Small Business Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Maintenance Dredging Summary: U.S. Army Corps of Engineers (USACE), South Atlantic Division (SAD) is contemplating the issuance of a Small Business Regional Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Maintenance Dredging and Shore Protection Projects within the Boundaries of USACE, SAD. See http://www.usace.army.mil/Locations.aspx for boundaries of USACE, SAD. These contracts will be established primarily to serve the boundaries of the SAD area of responsibility. Secondarily, these contracts may be used to provide services outside of SAD in the event of emergency dredging requirements. The Small Business Regional Dredging MATOC will be for one base year and include four option years for a maximum total period of five years. The MATOC will have a maximum combined capacity of $400M. One pool of contractors will be awarded contracts, based on the small business size standard for NAICS Code 237990, Dredging and Surface Cleanup Activities. Task orders for work that has been historically set-aside for small business will be set-aside under the small business MATOC pool in accordance with FAR 16.505(b)(2)(i)(F). PLA is defined as a Pre-Hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Reference Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, and Federal Acquisition Regulation (FAR) 22.5. Also reference provision 52.222-33 Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreements. NOTE: Each Task Order may be evaluated on a project-by-project basis for possible application of a PLA. In consideration of the above factors and any others which may be deemed appropriate, the dredging community is invited to comment on the use of PLA's. The Government is requesting responses to the following questions: 1. Do you have knowledge that a PLA has been used in the local area on projects of this kind If so, please provide supporting documentation. Project Name and Location Detailed Project Description Initial Cost Estimate vs. Actual Final Cost Was the project completed on time Number of craft trades present on the project Were there any challenges experienced during the project 2. Are you aware and/or are there concerns by the prime contractors of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project If so, please elaborate and provide supporting documentation. Information may reference current apprenticeship statistics and workforce age demographics. 3. Are you aware of time sensitive issues/scheduling requirements where use of the PLA would affect the rate at which the referenced project would be completed If so, please elaborate and provide supporting documentation. 4. Are you aware of any cost impact where the use of PLA will affect the construction cost of the referenced project If so, please elaborate and provide supporting documentation. 5. Based on FAR 52.222-33 and alternates and 52.222-34 and alternates do you see any negative and/or positive impacts of submitting the PLA at one phase of the procurement process over another If so, please explain. 6. Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. 7. Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. 8. Identify any additional information with supporting documentation/statistics that you believe should be considered on the use of a PLA on the referenced project. 9. Identify any additional information with supporting documentation/statistics that you believe should be considered on the non-use of a PLA on the referenced project. 10. Is your firm a serious interested party in that you intend to submit a proposal for this procurement Will the use of a PLA impact your ability to bid If so, please explain Please provide your responses by no later than 3:00 PM Eastern Standard Time (EST), Friday, 9 February 2024. Submit your responses and any questions to Mr. Timothy Humphrey via email at Timothy.G.Humphrey@usace.army.mil and Mr. William J. Wallace at William.J.Wallace@usace.army.mil.
Final Planning
Water / Sewer
Public - Federal
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 9, 2024
Multiple Locations, Jacksonville, FL
Related To This Project
Jacksonville, FL
Bid Date: May 08 2024
Jacksonville, FL
Bid Date: Mar 05 2024
Jacksonville, FL
Bid Date: Feb 27 2024
Jacksonville, FL
Bid Date: Apr 02 2019
Jacksonville, FL
Bid Date: Feb 15 2024
Jacksonville, FL
--
Jacksonville, FL
Bid Date: Feb 17 2021
Jacksonville, FL
Bid Date: Apr 17 2019
Jacksonville, FL
--
Jacksonville, FL
--
Jacksonville, FL
--
Jacksonville, FL
--
Jacksonville, FL
Bid Date: Feb 16 2024
Jacksonville, FL
Bid Date: Feb 28 2024
Jacksonville, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.