BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Terrebonne, Quebec. Design plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Upgrades, repairs and improvements to the City wastewater treatment network and system. The scope of the project includes the construction of a new REGIONAL pumping station T65 and upgrades to the existing Moody pumping station. The scope of work also includes associated piping and road improvement work. The new pumping station will be located on 40th Avenue near Côte de Terrebonne, Moody pumping station being located at 1240 Saint-Louis Street. TIMELINE: The owner has awarded professional consultants for the project design and construction work monitoring. Preliminary studies and conceptual planning are underway. Preliminary plans are expected to begin in early fall 2024. Schedules for further project development are being finalized. Note. According to the owner's preliminary scheduling construction will start in summer 2025.

Design

Water / Sewer

$7,956,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
170
Bidding Soon
2,822
All Active Projects
1,228
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 15, 2025

April 15, 2026

img_map_placeholder

Multiple Locations, Terrebonne, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.