BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in Fontana, California. Completed plans call for site work for a playground / park / athletic field.

Bid Valid 90 days Liquidated Damages $1,500 each calendar day Estimated Bid Value $607,945.00 Start/Delivery Date Approximately April 2024/Completed by May 2024 Project Duration Within 25 working days after the Notice to Proceed Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 02/08/2024 at 2:00 PM PT Any questions pertaining to this project should be done via online The work of improvement consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications and Contract Documents for the above stated project. The general items of work to be done hereunder consist of clearing and grading all areas as required for the installation of all improvements as shown on the plans including but not limited to new wrought iron fencing, fence posts with footings, pedestrian gates, vehicular swing and rolling gates, CMU wall, artificial turf installation, restoring all improvements to preconstruction conditions, and all other related work required as indicated on the project plans for the Miller Park Fence Installation Project. This project is located at Miller Park and Miller Park Amphitheater, adjacent to Fontana City Hall. The City reserves the right to reject any or all bids, to waive any irregularity, to accept any bid or portion thereof, and to take all bids under advisement for a period of ninety (90) calendar days. This project is located at Miller Park and Miller Park Amphitheater, adjacent to Fontana City Hall. Proposals must be accompanied by a proposal guarantee in the form of cash, cashier's check, a certified check or bid bond available to the City in the amount of at least ten percent (10%) of the total amount bid. Any proposal not accompanied by such a guarantee will not be considered. A payment bond and a performance bond, each in an amount equal to 100% of the total contract amount, shall be required concurrently with the execution of the contract and shall be in the form set forth in the contract documents. At the time of submitting a bid, the prime contractor and subcontractor shall possess a Class "A" contractor's license or a combination of Class "C" specialty contractor's license(s) sufficient to perform the work.

Award

Playgrounds / Parks / Athletic Fields

$605,572.00

Public - City

Site Work

11

10

5

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
102
Bidding Soon
2,219
All Active Projects
997
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 15, 2024

img_map_placeholder

17004 Arrow Blvd, Fontana, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.