BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Chula Vista, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Pavement Maintenance at Chula Vista Bayfront Parks Parking Lot Scope of Work: A. Furnish all labor, materials, equipment, supplies, transportation and disposal as necessary to complete the construction of NOTICE TO CONTRACTORS, Chula Vista, CA in accordance with Specification No. 2023-14 and Drawing No. CV-2023-01. The Work shall include, but is not limited to the following: a) Bayfront Park's Parking Lots 1, 2, and 3: approximately 4" thick full asphalt concrete replacement, compaction of existing base, pavement marking and striping, catch basin repair and grate replacement, adjust manhole and valve covers to grade as required as shown on the drawings and as described in these specifications. In addition, erosion control and SWPPP preparation, implementation, and maintenance throughout the project duration shall be included. b) Marina Way roadway: approximately 6" thick full asphalt concrete replacement, compaction of existing base, pavement marking and striping, adjust manhole and valve covers to grade as required as shown on the drawings and as described in these specifications. In addition, erosion control and SWPPP preparation, implementation, and maintenance throughout the project duration shall be included. B. It is intended that the Work be completed in every respect under the Contract Document, and such items or details not mentioned above or not included in the Bid Schedule that are required by the Contract Documents shall be furnished, performed, placed, constructed, or installed by the Contractor. C. The total contract duration is 90 calendar days. The Engineer's Construction estimate for this work is $2M. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,000.00 Per Calendar Day Contractor's Qualifications: A. The Contractor's License Requirement for this contract is a California State Contractor's License, General Engineering Contractor, License A or Earthwork and Paving Contractor, License C-12 , in accordance with the provisions of Division 3, Chapter 9, of the Business and Professions Code of the State of California. B. Contractor or its Subcontractors shall comply with all other required certifications and qualification as described in various sections of the Contract Documents. In addition, Bidder shall have a minimum of five (5) years of experience of successful completion of projects of similar scope and size as described in the Scope of Work. Questions or comments regarding this specification must be submitted electronically to our Online system where the specification was downloaded and must be received by the Port no later than February 14, 2024 @ 2:00 p.m. Questions received after the date stated here will not be accepted. Emails and faxes will not be accepted. Responses from the Port will be communicated via the electronic Online system to all recipients of this specification. Award of the contract, if made, will be within 120 calendar days after bid opening date. A bid guarantee in accordance with Subsection 5.6.2 of the General Condition is required with submission of a bid. No Bidder may withdraw a bid after the date set for bid opening. Project is subject to compliance with the terms of the San Diego Unified Port District Project Labor Agreement attached hereto as Appendix C, "San Diego Unified Port District Project Labor Agreement" and as described in Section 01 13 00 "Supplementary Requirements" of these Specifications as well as in Articles 4.4.4 of the Instructions to Bidders. Bidder shall file the bonds as required by the Contract and Civil Code section 9554. The provisions of Public Contract Code section 22300 apply to this Contract. Bidders are hereby notified that the successful Bidder will be required to provide insurance in accordance with Subsection 5.6.1, "Contractor's Insurance," of the Section 5.0, General Condition. A Notification Regarding Environmental Conditions has been included as Exhibit A in the project specifications. This notification will serve as the District's disclosure regarding potential hazardous materials that may be encountered during grading, excavation, trenching, and/or other ground penetration. In the public interest, the Port reserves the right to reject any or all bids, or to waive any informality in a bid

Award

Sidewalks / Parking Lot

$1,450,000.00

Public - County

Paving, Site Work

17

17

5

8

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
24
Bidding Soon
499
All Active Projects
222
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

May 6, 2024

img_map_placeholder

980 Marina Way, Chula Vista, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.